Biomass Power Plants in Canada
Celgar Mill
Location: BC
Operator: Mercer International Inc
Configuration: 1 X 52 MW CHP
Operation: ??
Fuel: black liquor
Boiler supplier: ??
T/G supplier: Delaval
Quick facts: The first CHP unit at Celgar was a 2.5-MW steam set installed in 1963 and now out of service. In the 1990s, a 52-MW machine was installed and a 48-MW turbine is being added for operation in 2010. In Dec 2008, a Mercer long-term proposal to supply about 24 MW of bioenergy to BC Hydro was selected for negotiation. About 7 MW of electricity surplus to mill requirements is already sold to BC Hydro.

Photograph courtesy of Mercer International
Posted 8 Feb 2005

Chapais
Location: BC
Operator: Conifex Power
Configuration: 1 X 31 MW
Operation: 1995
Fuel: wood
Boiler supplier: Cerrey
T/G supplier: MHI, Melco
EPC: HMI Construction Inc
Quick facts: This PS went online in Jul 1995. Output is fully contracted to Hydro Quebec.

Photograph courtesy of Northland Power Inc
Posted 29 Jan 2017

Conifex
Location: BC
Operator: Conifex Power
Configuration: 1 X 36 MW
Operation: 2015
Fuel: wood
Boiler supplier: ABB
T/G supplier: Dresser, Brush
EPC: Clean Energy Consulting Inc, Spectrum Energy, JB Driver Projects Inc
Quick facts: This PS in Mackenzie, in the northern interior of British Columbia, uses sawmill residues to supply about 230 GWh/yr for BC Hydro. The refurbished CFB boiler supplies 28,000 pph of steam for the new T/G set. Preliminary construction began in Aug 2012 and the plan commissioned in Apr 2015. Vancouver-based Conifex Timber Inc is a publicly-traded forest products company.

Photograph courtesy of Conifex Timber Ltd
Posted 10 Feb 2016

Edmundston Mill-3
Location: NB
Operator: Fraser Papers Inc
Configuration: 1 X 44.5 MW
Operation: 1997
Fuel: wood
Boiler supplier: Zurn
T/G supplier: GE
Quick facts: About 1,900 tpd of wood waste is used for this industrial power plant. It was built in 22mos.

Photograph courtesy of NEPCO
Posted 21 Jul 2004

Roddickton
Location: NL
Operator: Newfoundland & Labrador Hydro
Configuration: 1 X 5 MW
Operation: 1989 (ret 1996)
Fuel: wood
Boiler supplier: ??
T/G supplier: Peter Brotherhood
EPC: SNC-Lavalin
Quick Facts: Roddickton was Nefoundland's only biomass power plant and provided primary power to the communities of St Anthony, Main Brook and Roddickton. The plant became uneconomic when a new tie-line was connected to the region and was closed in Sep 1996. In Mar 2007, the site was acquired via long-term lease from Nalcor Energy by a local forest products company. It will be partially reused for a new pellet plant. Innoventé purchased the generating equipment and is relocating it to St-Patrice-de-Beaurivage, QC.

Photograph courtesy of www.northernpen.com
Posted 20 Mar 2011

Senneterre
Location: QC
Operator: Boralex
Configuration: 1 X 34.6 MW CHP
Operation: 2002
Fuel: wood
Boiler supplier: ANN
T/G supplier: MHI, Melco
EPC: GENIVAR
Quick Facts: Senneterre in the Abitibi-Témiscamingue region was originaly developed by Indeck Energy Services and implemented by Boralex Power Income Fund. Fuel burn is about 400,000 tpy and about 230 GWH/yr is sold to Hydro-Quebec. The project cost C$60mn and is in intermittent operation due to fuel-supply issues.

Photograph courtesy of Indeck Energy Services Inc
Posted 7 Nov 2009

   

Skookumchuk Mill
Location: BC
Operator: Tembec Inc
Configuration: 1 X 43 MW CHP
Operation: 2002
Fuel: wood, natural gas
Boiler supplier: Combustion Engineering, Detroit Stoker
T/G supplier: Siemens
EPC: Stothert Engineering Ltd
Quick facts: This new T/G set was added in 2002. Power surplus to mill requirements is sold to BC Hydro.

Photograph courtesy of Tembec Inc
Posted 13 Aug 2005