Bang Mun Nak
Location: Pichit
Operator: AT Biopower Co Ltd
Configuration: 1 X 22 MW
Operation: 2005
Fuel: rice husk Boiler supplier: McBurney
T/G supplier: Shin Nippon, Elin
Quick facts: This facility is in Bang Mun Nak District, Pichit Province,
and went commercial on 21 Dec 2005. The plant burns about 150,000 tpy of
rice husk and has a 25 yr PPA with EGAT under Thailand's Small Power
Producer (SPP) program. The plant cost about 1,400mn Baht. The McBurney
suspension firing system was the first-ever installation for a rice-husk
fueled power plant. Project investors include Chubu Electric Power Co, Al
Tayyar Energy, Private Energy Market Fund, Finnish Fund for Industrial
Cooperation, Flagship Asia Corp, and Rolls-Royce Power Ventures. The plant
received financial support of 900mn Baht from TMB Bank and Siam City Bank.
Photograph courtesy of
Electrowatt-Ekono
Posted 25 Feb 2009 |
Burirum
Location: Buri Ram
Operator: Advance Bio Power Co Ltd
Configuration: 1 X 9.5 MW
Operation: 2007
Fuel: rice husk Boiler supplier: Veesons
T/G supplier: ??
Quick facts: This is the first power plant in Thailand designed to burn
100% eucalyptus bark and chips obtained from nearby sawmills. The Danish
Energy Agency supported this CDM project.
Photograph courtesy of
Danish Energy Agency
Posted 29 Apr 2009 |
CGC Plant
Location: Nakhon Ratchasima
Operator: C Gigantic Carbon Co Ltd
Configuration: 1 X 2.76 MW CHP
Operation: ??
Fuel: biomass Boiler supplier: ??
T/G supplier: ??
Quick facts: This is a captive power plant at Thailand's largest
manufacturer of activated carbon using coconut shell and wood as raw
materials
Photograph courtesy of C
Gigantic Carbon Co
Posted 28 Jun 2009 |
|
Roi Et
Location: Roi Et
Operator: Electricity Generating
Public Co Ltd
Configuration: 1 X 9.8 MW
Operation: 2006
Fuel: rice husk Boiler supplier: Yoshimine Co Ltd
T/G supplier: Shin Nippon, Meidensha
Quick facts: This biomass power plant is designed to burn 300t of rice
husk per day and has a 21yr PPA with EGAT under Thailand's SPP scheme. The project received financial support from the Industrial Finance
Corp of Thailand (IFCT) and the Office of Board of Investment (BOI).
J-Power was an engineering consultant.
Photograph courtesy of
Electricity Generating Public Co Ltd
Posted 17 Dec 2003
|
|
Surin MGP
Location: Prasart Surin
Operator: Mungcharoen Green Power Co Ltd
Configuration: 1 X 9.9 MW
Operation: 2007
Fuel: rice husk Boiler supplier: ??
T/G supplier: ??
Quick facts: This plant was commissioned in Jan 2007. The SPP cost THB
550mn and took 2yrs to build. The plant fuel is about 85,000 tpy of rice
husk supplied by farmers within a 30km radius of the plant site. MGP is
the first large-scale, rice husk-based power plant project developed,
invested, implemented, operated and maintained exclusively by a group of
local rice millers and has a 21yr PPA contract with EGAT. The plant is
directly connected to PEA’s 22kV grid The owners invested THB 150mn while
THB 400mn was loaned by Bankthai Public Co Ltd and the Department of
Alternative Energy Development and Efficiency (DEDE).
Photograph courtesy of Mungcharoen Green Power Co Ltd
Posted 17 Jun 2009 |