Altavista
Location: VA
Operator: Dominion Virginia Power
Configuration: 1 X 51 MW CHP
Operation: 1992
Fuel: wood
Boiler supplier: B&W
T/G supplier: MHI
EPC: Ultrasystems E&C
Quick facts: This stoker-fired CHP plant was developed by Hadson Power with two boilers and a single T/G set. It supplied electricity to the grid and steam to Lane Furniture Co. In Dec 1991, LG&E Energy purchased Hadson Power and in Dec 2000, Dominion agreed to buy all three LG&E power plants in Virginia. The Altavista power plant was the first generating station in Virginia to receive the State's Occupational Health and Safety STAR award since the program's inception in 1996. Converted to 100% biomass and restarted at 51 MW in Jul 2013.

Photograph courtesy of Dominion Virginia Power
Posted 15 Jun 2008

Craven County
Location: NC
Operator: AltaGas
Configuration: 1 X 50 MW
Operation: 1990
Fuel: wood
Boiler supplier: Zurn
T/G supplier: MHI, Brush
EPC: NEPCO
Quick Facts: The Craven County plant is designed to burn about 1,900 tpd of wood waste and was originally developed by U.S. Energy Corp and HYDRA-CO Enterprises Inc. It is now a 50:50 venture of AltaGas and CMS Energy.

Photograph courtesy of NEPCO
Posted 17 May 2003

Hopewell Biomass
Location: VA
Operator: Dominion Virginia Power
Configuration: 1 X 51 MW
Operation: 1992
Fuel: wood
Boiler supplier: B&W
T/G supplier: MHI, Alstom
EPC: Ultrasystems E&C
Quick facts: This station went commercial in Jul 1992 with two stoker boilers burning coal and gob, one of three sisteer plants built as IPPs by Ultrasystems and later acquired by Hadson industries. It was purchased by Dominion in 2003 and converted to biomass in 2013 at a cost of $55mn. Fuel burn is about 600,000 tpy.

Photograph courtesy of Dominion Virginia Power
Posted 2 May 2015

Piedmont Green Power
Location: GA
Operator: Rollcast Energy Inc
Configuration: 1 X 55 MW
Operation: 2013
Fuel: wood
Boiler supplier: EPI
T/G supplier: Siemens
EPC: HBZ
Quick Facts: This biopower station is in Barnesville about 70mi southeast of Atlanta. Financial close was in Oct 2010 and COD was 19 Apr 2013. Design fuel throughput is 500,000 tpy of woody biomass. Rollcast has a 20yr PPA with Georgia Power for 100% of plant production. O&M is by Delta Power Services.

Photograph courtesy of Rollcast Energy Inc
Posted 18 May 2013

Pittsylvania
Location: VA
Operator: Dominion Virginia Power
Configuration: 2 X 41.5-MW
Operation: 1994
Fuel: wood
Boiler supplier: BS
T/G supplier: ABB Stal, ABB
EPC: Duke E&C, Tyger
Quick facts: This station has a 224c site in Hurt across the rive from Altavista PS. It was bought by Dominion from Multitrade in Nov 2004, thereby termnating a 25yr PPA and reducing Dominion's IPP capacity payments by $16-20mn/yr.

Photograph courtesy of Dominion Virginia Power
Posted 2 May 2015

Roxboro Project
Location: NC
Operator: Capital Power
Configuration: 1 X 47 MW
Operation: 1987
Fuel: wood, coal, TDF
Boiler supplier: FW
T/G supplier: GE
EPC: Cogentrix Inc
Quick Facts: Roxboro was originally a coal-fired CHP which went commercial in Aug 1987 with three stoker boilers and a 56-MW steam set. The plant was rebuilt as a predominantly wood-fired plant with a re-rated capacity of about 47 MW. As built, the plant sold steam to a local manufacturer Collins & Aikman Corp. This firm went bankrupt and closed in Oct 2007. The Roxboro facility then resciinded its qualifying cogeneration facility status under PURPA and, since Q1, 2010, has operated as PURPA small power production facility.

Photograph courtesy of Capital Power
Posted 20 Nov 2013

SRS F Area
Location: SC
Operator: Ameresco Inc
Configuration: 3 X 6.67 MW CHP
Operation: 2012
Fuel: wood
Boiler supplier: EPI
T/G supplier: TGM, WEG
EPC: Ameresco
Quick Facts: This power station was part of a $795mn contract with USDOE to design and implement the country's largest renewable energy savings perormance contract at the Savannah River site. The biomass CHP was the main component and replaced an old, cola and biomass CHP uit. Two small package heating plants were also installled. The F area plant has two boilers and three T/G sets and is capable of producing up to 240,000 lb/hr of high-pressure steam. Construction began in Sep 2009 and completed in Dec 2011. The award also includes a 19yr O&M contract.

Photograph courtesy of Ameresco Inc
Posted 31 Mar 2012

Southampton Biomass
Location: VA
Operator: Dominion Virginia Power
Configuration: 1 X 51 MW
Operation: 1992
Fuel: wood
Boiler supplier: B&W
T/G supplier: MHI, Alstom
EPC: HSPE, Ultrasystems E&C
Quick facts: This station has a 24ac site in Franklin. It was built as a coal-fired unit, bought by Dominion in 2003, and converted to biomass in 2013. Fuel burn is about 600,000 tpy.

Photograph courtesy of Dominion Virginia Power
Posted 2 May 2015

Southport
Location: NC
Operator: Capital Power
Configuration: 2 X 44 MW CHP
Operation: 1987
Fuel: wood, coal, TDF
Boiler supplier: FW
T/G supplier: GE
EPC: Cogentrix Inc
Quick Facts: Southport was originally a coal-fired CHP which went commercial in Aug 1987 with two units, each with three stoker boilers and a 56-MW steam set. The plant was rebuilt as a predominantly wood-fired plant with a re-rated capacity of about 88 MW. Southport sells steam to an Archer Daniels Midland feed additive manufacturing plant and remains a qualifying cogeneration facility under PURPA.

Photograph courtesy of Capital Power
Posted 20 Nov 2013