CCGT Plants in Algeria
Ain El Bya Phase II
Location: Oum El-Bouaghi
Operator: Sonelgaz Production de l’Electricite
Configuration: 2 x 150 MW GT13E2
Operation: 2004
Fuel: natural gas, oil
T/G supplier: Alstom
EPC: Alstom, INERGA
Quick facts: This plant is in the eastern part of Algiers.

Photograph courtesy of INERGA
Posted 30 Jan 2010

Bab-Ezzouar
Location: El Djazaïr
Operator: Sonelgaz Production de l’Electricite
Configuration: 4 x 27 MW GT9D
Operation: 1978
Fuel: natural gas, oil
T/G supplier: BBC, CEM
EPC: BBC
Quick facts: This plant is in the eastern part of Algiers.

Photograph by Florian Donno
Posted 24 Jan 2007

Berrouaghia
Location: Medea
Operator: Sonelgaz Production de l’Electricite
Configuration: 2 x 250 MW SGT5-4000F
Operation: 2006
Fuel: natural gas, oil
T/G supplier: Siemens
EPC: Siemens
Quick facts: In Jan 2005, Siemens was awarded a contract to build this plant 130km south of Algiers. The supply scope included the gas turbines plus auxiliaries, and a 7yr O&M contract.

Photograph courtesy of INERGA
Posted 30 Jan 2010

F'Kirina
Location: Oum el-Bouaghi
Operator: Sonelgaz Production de l’Electricite
Configuration: 2 x 150 MW GT13E2
Operation: 2004
Fuel: natural gas, oil
T/G supplier: Alstom
EPC: Alstom, SDEM
Quick facts: Construction started in Sep 2003 at this site 520km east of Algiers. In addition to the generating equipment, Alstom also supplied the HV substation and auxiliaries as part of the €123mn turnkey order.

Photograph courtesy of SDEM Entreprises
Posted 14 Sep 2008

Hadjret En-Nouss
Location: Tipaza
Operator: Sharikat Kahraba Hadjret En-Nouss
Configuration: 3 X 420 MW single-shaft CCGT blocks with 9001FB gas turbines
Operation: 2009
Fuel: natural gas, oil
HRSG supplier: Doosan
T/G supplier: GE
EPC: SNC, Sandwell, Groupe SCV
Quick facts: In Nov 2006, GE Energy announced the sale of three 109FB single-shaft CCGT blocks for the Hadjret En-Nouss plant sited in Tipaza, 100km west of Algiers. Project company SKH is owned 49% by a consortium of Sonatrach, Sonelgaz and AEC and 51% by Algerian Utilities International Ltd, a joint venture between SNC-Lavalin and mubadala. GE also has a 20yr LTSA with SNC, which is the plant O&M contractor. SKH has a 20yr take-or-pay PPA with Sonelgaz. The plant cost about $885mn.

Photograph courtesy of mubadala
Re-posted 1 Nov 2013

Hamma Phase II
Location: Alger
Operator: Sonelgaz Production de l’Electricite
Configuration: 2 x 209 MW V94.3A1
Operation: 2002
Fuel: natural gas, diesel oil
T/G supplier: Siemens, Ansaldo
EPC: Fichtner, Ansaldo
Quick facts: This $277mn plant was originally planned as an IPP, but was instead built by SPE. The Arab Fund for Social and Economic Development made a $98mn loan for the project in May 1999. Other lenders include the Islamic Development Bank ($205mn) and Societe Generale which provided $24mn in lira. The design allows for future conversion to combined-cycle operation. In 2006, SPE selected Rovsing Dynamics to supply a new condition monitoring system for the GTs.

Photograph courtesy of Rovsing Dynamics
Posted 20 Jan 2010

Hassi Messaoud Norte Phase II
Location: Ouargla
Operator: Sonelgaz Production de l’Electricite
Configuration: 2 x 100 MW GT13E2
Operation: 1988
Fuel: natural gas, oil
T/G supplier: Nuovo Pignone, Alstom
EPC: Nuovo Pignone, Alstom, INERGA

Photograph courtesy of INERGA
Posted 30 Jan 2010

Kahrama
Location: Oran
Operator: Algerian Energy Co
Configuration: 3 X 106 MW 9001E gas turbines, desal
Operation: 2005
Fuel: natural gas
T/G supplier: GE, Elin
EPC: IHI, Itochu, Jurong Engineering
Quick facts: Kahrama is Algeria’s first independent water and power project (IWPP) and is capable of producing 86,880m³/day of potable water in addition to electricity. The $400mn plant has 25yr electricity and water PPAs with Sonelgas and Sonatrach. The project was partly financed by Coface and Japan Bank for International Cooperation with the balance from AEC. The $260mn EPC contract was awarded in early 2002.

Photograph courtesy of Algerian Energy Co
Posted 15 Apr 2009

Koudiet Eddraouch
Location: El-Tarf
Operator: Shariket Karhaba Koudiet Eddraouch
Configuration: 3 X 400 MW single-shaft CCGT blocks with 9001FB gas turbines
Operation: 2012-2013
Fuel: natural gas
HRSG supplier: Doosan
T/G supplier: GE
EPC: Iberinco, Eurl Kraytem
Quick facts: In Jun 2008, Shariket Karhaba Koudiet Eddraouch, owned by Sonelgaz and Sonatrach, awarded GE and Iberinco the EPC contract for this power station in El-Tarf province, 40km east of Annaba, and 700km east of Algiers. The contract period was specified as 48.5mos but completion was somewhat delayed. The first two blocks went online in Dec 2012 and the third block in Oct 2013. The project cost was said to be $2.7bn.

Photograph by Darboux (Panoramio)
Posted 13 Mar 2013

 
Marsat El Hadjadj
Location: Marsat El Hadjaj
Operator: Sonelgaz Production de l’Electricite
Configuration: 8 x 25 MW 5001PTG
Operation: 2007
Fuel: natural gas, oil
T/G supplier: Thomassen, Holec
EPC: INERGA
Quick facts: These machines were relocated from the SPE site at M'Sila. The project took 7mos.

Photograph courtesy of INERGA
Posted 30 Jan 2010

  Skikda
Location: Skikda
Operator: Shariket Kahraba Skikda (SKS)
Configuration: 2 X 440-MW 1+1 CCGT blocks with 9001FA gas turbines
Operation: 2005-2006
Fuel: natural gas, oil
HRSG supplier: Alstom
T/G supplier: GE, Alstom
EPC: SNC, INERGA, Eurl Kraytem
Quick facts: In Jul 2003, SNC-Lavalin was awarded contracts by SKS, an Algerian Energy affiliate, for construction and operation of this CCGT plant. SNC-Lavalin Capital structured the required financing and SNC-Lavalin also has a 12yr contract for plant O&M. In Dec 2003, the U.S. Export-Import Bank approved a $192mn, long-term loan guarantee to support construction of the Skikda project. In Mar 2004, Alstom was awarded a €55mn contract for two HRSGs and a pair of 195-MW steam sets.

Photograph courtesy of INERGA
Posted 30 Jan 2010