CCGT Plants in Austria
![]() |
![]() |
![]() |
|
Donaustadt-3 Location: WIEN Operator: Wienstrom Configuration: 367-MW single-shaft CCGT with V94.3A gas turbine CHP Fuel: natural gas Operation: 2001 HRSG supplier: Danubius T/G supplier: Siemens
Photograph courtesy of Wienstrom |
Leopoldau Location: WIEN Operator: Wienstrom Configuration: 155-MW 1+1 CCGT block with V94 gas turbine CHP Fuel: natural gas Operation: 1976-1987 HRSG supplier: Biro T/G supplier: Siemens, SGP Quick facts: Leopoldau has what is considered the first SCR installed on a European combined-cycle, built in 1988.
Photograph courtesy of Wienstrom |
Mellach CC Photograph courtesy of Siemens |
|
|
|
|
Salzburg Mitte Location: SBG Operator: Salzburger Stadtwerke AG Configuration: 85-MW, 1+1 CCGT with GT8C2 gas turbine CHP Fuel: natural gas Operation: 2001-2002 HRSG supplier: Alstom T/G supplier: ABB, Siemens Photograph courtesy of Salzburger Stadtwerke AG |
Timelkam CC Location: OOE Operator: Gas- und Dampfkraftwerk Timelkam GmbH Configuration: 405-MW, single-shaft CCGT with SCC5-4000F gas turbine Fuel: natural gas Operation: 2008 HRSG supplier: Balcke Dürr T/G supplier: Siemens EPC: Siemens, HGW Ingenieurgesellschaft mbH Quick facts: The plant operating company is a joint venture of Energie AG Oberösterreich Kraftwerke GmbH and Groupe E SA. The plant was built in 25mos and has a design thermal efficiency of 59%. Photograph courtesy of Energie AG Oberösterreich |
|
![]() |
||
Data: industcards, Platts UDI World Electric Power Plants Data Base