CCGT Power Plants in China - Fujian & Zhejiang
Fujian Jinjiang
Location: Fujian
Operator: Fujian Energy Group Co Ltd
Configuration: 4 X 390-MW CCGT blocks with 9001FA gas turbines
Fuel: LNG
Operation: 2009-2010
HRSG supplier: Hangzhou
T/G supplier: GE, Harbin
Quick facts: In Apr 2007, Fujian Jinjiang Gas Power Co Ltd began work on this CCGT plant on the coast of the Taiwan Strait in Shizhen Village, Jinjing Town, Jinjiang City. The project company is invested by Fujian Energy Group Co. The first block started commissioning in Mar 2008 and went commercial on 15 Jan 2009 and the second followed in May 2009 with the final two blocks going online in 2010. Design fuel is about 820,000 tpy of LNG from Indonesia’s Tangguh gas field. In August 2009, GE Energy signed a $115mn, LTSA for the project.

Photograph by dew3y (Panoramio)
Posted 12 Nov 2011

Guohua Yuyao
Location: Zhejiang
Operator: Shenhua Guohua Electric Power Corp
Configuration: 780-MW, 2+1 CCGT with 9001FA gas turbines
Fuel: gas
Operation: 2007
HRSG supplier: Nanjing Boiler
T/G supplier: GE
Quick facts: This is an 80:20 JV with Yuyao City Construction Investment Development Co. The plant cost RMB 2.375bn. First concrete was in June 2004 and the plant went commercial in Aug 2007. This was the first Chinese gas-fired plant to receive CDM approval.

Photograph courtesy of Shenhua Guohua Electric Power Corp
Posted 19 Jun 2011

Hangzhou Banshan
Location: Zhejiang
Operator: Shenhua Guohua Electric Power Corp
Configuration: 3 X 390-MW single-shaft CCGT blocks with 9001FA gas turbines
Fuel: natural gas
Operation: 2005
HRSG supplier: Hangzhou Boiler
T/G supplier: GE
EPC: Zhejiang Electric Power Construction Corp
Quick facts: In July 2004, the first 9001FA gas turbine to be assembled in China under a GE technology transfer agreement was shipped from Harbin Power Equipment’s factory in Qinhuangdao, Heibei, to the Hangzhou Banshan plant in Hangzhou City. In December 2005, the last of three 390-MW blocks went online, making this first, 1-GW gas-fired CCGT power station in China. The plant cost RMB 40bn. Excavation bega in February 2010, main steel erection started in June 2005, and Unit-1 went online on 1 January 2005. Fuel is about 800mn m³/yr of western gas.

Photograph courtesy of China Huadian Corp
Posted 22 Jun 2011

 
Hangzhou Ziyun
Location: Zhejiang
Operator: Hangzhou Ziyun Energy Utilization Development Co Ltd
Configuration: 45-MW LM5000 STIG gas turbine
Fuel: natural gas
Operation: ??
T/G supplier: GE
Quick facts: The control system for this installation was supplied by Jiangsu Zhonghang Power Control Co Ltd.

Photograph courtesy of Jiangsu Zhonghang Power Control Co Ltd
Posted 15 Mar 2009

Putian CNOOC
Location: Fujian
Operator: CNOOC Gas & Power Ltd
Configuration: 4 X 390-MW single-shaft CCGT blocks with M701F gas turbines
Fuel: LNG
Operation: 2008-2010
HRSG supplier: CMI
T/G supplier: MHI, Dongfang
EPC: SEPCO
Quick facts: In Oct 2006, MHI received an order from Dongfang for core components for four M701F gas turbines for the Putian CCGT plant. MHI supplied blades, rotors and control systems while combustors were built by Mitsubishi Heavy Industries Dongfang Gas Turbine (Guangzhou) Co Ltd. The site is near a new LNG terminal in Putian district, 150km northeast of Xiamen. The Putian CCGT is expected to consume about a third of CNOOC's LNG imports from Indonesia with each block burning about 800,000 tpy. The power station cost 5.08bn yuan and was officially opened in Jul 2010. Four more blocks may be built in the future.

Photograph courtesy of CNOOC Gas & Power Ltd
Posted 14 Jul 2010

Abbreviations

Data: industcards, Platts UDI World Electric Power Plants Data Base

Updated 12-Nov-2011

Home