CCGT Power Plants in China - Fujian & Zhejiang
![]() |
![]() |
![]() |
|
Fujian Jinjiang Location: Fujian Operator: Fujian Energy Group Co Ltd Configuration: 4 X 390-MW CCGT blocks with 9001FA gas turbines Fuel: LNG Operation: 2009-2010 HRSG supplier: Hangzhou T/G supplier: GE, Harbin Quick facts: In Apr 2007, Fujian Jinjiang Gas Power Co Ltd began work on this CCGT plant on the coast of the Taiwan Strait in Shizhen Village, Jinjing Town, Jinjiang City. The project company is invested by Fujian Energy Group Co. The first block started commissioning in Mar 2008 and went commercial on 15 Jan 2009 and the second followed in May 2009 with the final two blocks going online in 2010. Design fuel is about 820,000 tpy of LNG from Indonesia’s Tangguh gas field. In August 2009, GE Energy signed a $115mn, LTSA for the project. Photograph by dew3y (Panoramio) |
Guohua Yuyao Location: Zhejiang Operator: Shenhua Guohua Electric Power Corp Configuration: 780-MW, 2+1 CCGT with 9001FA gas turbines Fuel: gas Operation: 2007 HRSG supplier: Nanjing Boiler T/G supplier: GE Quick facts: This is an 80:20 JV with Yuyao City Construction Investment Development Co. The plant cost RMB 2.375bn. First concrete was in June 2004 and the plant went commercial in Aug 2007. This was the first Chinese gas-fired plant to receive CDM approval. Photograph courtesy of Shenhua Guohua Electric Power Corp |
Hangzhou Banshan Photograph courtesy of China Huadian Corp |
![]() |
![]() |
|
|
Hangzhou Ziyun Location: Zhejiang Operator: Hangzhou Ziyun Energy Utilization Development Co Ltd Configuration: 45-MW LM5000 STIG gas turbine Fuel: natural gas Operation: ?? T/G supplier: GE Quick facts: The control system for this installation was supplied by Jiangsu Zhonghang Power Control Co Ltd. Photograph courtesy of Jiangsu Zhonghang Power Control Co Ltd |
Putian CNOOC Photograph courtesy of CNOOC Gas & Power Ltd |
|
![]() |
||
Data: industcards, Platts UDI World Electric Power Plants Data Base