CCGT Power Plants Elsewhere
Abadan GT
Location: Turkmenistan
Operator: Calik Energy
Configuration: 3 x 42 MW 6001B gas turbine
Operation: 2004
Fuel: natural gas
T/G supplier: GE
EPC: GE, Calik Enerji

Photograph courtesy of Calik Enerji
Posted 12 May 2004

Balkanabad GT
Location: Turkmenistan
Operator: Calik Energy
Configuration: 3 x 42 MW 6001B gas turbine
Operation: 2004
Fuel: natural gas
T/G supplier: GE
EPC: GE, Calik Enerji

Photograph courtesy of Calik Enerji
Posted 12 May 2004

 

Bukit Panggal
Location: Brunei
Operator: Department of Electrical Services
Configuration: 110-MW, 2+1 CCGT with 6001B gas turbines
Operation: 2007-2008
Fuel: natural gas
HRSG supplier: Toshiba
T/G supplier: GE
EPC: GE Energy, Marubeni, Toshiba, Jurong Engineering
Quick facts: In Apr 2005, Marubeni was awarded a ¥10bn, turnkey contract for Phase I of the Bukit Panggal CCGT at Tutong. This is Brunei's first combined-cycle plant. The project was entirely funded by DES and completed in Jan 2008.

Photograph courtesy of Marubeni Corp
Posted 16 Dec 2009

Northwest Kabul
Location: Afghanistan
Operator: Ministry of Energy and Water
Configuration: 1 x 22 MW, 1 X 23 MW GT9 gas turbines
Operation: 1983
Fuel: diesel oil
T/G supplier: BBC
EPC: BBC
Quick facts: This is the only utility thermal power plant of any significance in Afghanistan. The machines were built for peak load service but now run baseload. Conversion to combined-cycle operation was started but is now delayed.

Photograph courtesy of U.S. Agency for International Development
Posted 4 Nov 2006

 

Shimal (Severnaya)
Location: Azerbaijan
Operator: Azerenerji
Configuration: 395-MW single-shaft combined-cycle block with M701F gas turbine
Operation: 2003
Fuel: natural gas
HRSG supplier: CMI
T/G supplier: MHI, Melco, ABB
EPC: Mitsui, MHI, TML-Borova, Epro
Quick facts: The Severnaya site is 40km north of Baku. In Feb 1998, Japan Bank for International Cooperation (JBIC) signed a ¥21bn Official Development Assistance (ODA) loan to help finance construction. This was followed in Oct 1999 by a ¥18bn ODA loan. In Mar 2000, the $201mn power plant contract was awarded. Burns & Roe was owner’s engineer. The project also included a gas pipeline component, bid on a separate track by Azerigaz. Toyo Engineering and TML-Borova were the lead contractors for a 90km gas line from Karadag to Digah plus a compressor station in Karadag sufficient to transport up to 5mn m³ of gas to Shimal plant plus a similar quantity on to Baku, Sumgait and Absheron peninsula. A second CCGT unit is planned.

Photograph courtesy of Azerenerji
Re-posted 24 Aug 2008

Turkmenbashi GT
Location: Turkmenistan
Operator: Calik Energy
Configuration: 3 x 42 MW 6001B gas turbine
Operation: 2004
Fuel: natural gas
T/G supplier: GE
EPC: GE, Calik Enerji

Photograph courtesy of Calik Enerji
Posted 12 May 2004

 