Bekasi
Location: West Java
Operator: PT Bekasi Power
Configuration: 130-MW, 2+1 CCGT with 6001B gas turbines
Fuel: natural gas, oil
Operation: 2009
HRSG: Thermax B&W
T/G supplier: GE, Shin Nippon
EPC: Internusa Technical Group
Quick facts: In Oct 2007, PT Bekasi Power started construction on this captive CCGT project in Kota Jababeka, Jababeka Industrial Estate Phase III, West Java. The developer is a wholly-owned subsidiary of PT Jababeka, the first publicly-listed industrial estate developer in Indonesia. Electricity is sold to tenants in Jababeka’s industrial estates and surrounding areas. Simple-cycle operations started in June 2009 and the entire project was completed in December 2009. Gas supply is from PGN and Pertamina.
Photograph by rivaldiharahap (Panoramio)
Posted 26 Sep 2012 |
Betara
Location: Lampung
Operator: PetroChina International Jabung Ltd
Configuration: 3 X 23.3 H-25 gas turbines
Fuel: natural gas
Operation: 2005
T/G supplier: Hitachi
EPC: Chiyoda
Quick facts: In Nov 2003, work got underway on the Betara natural
gas processing plant and associated facilities in Jambi Province, central
Sumatra. The development is by a consortium of PetroChina, Petronas, and Pertamina which encompasses gas
gathering and field facilities in the Jabung block, the Betara gas plant,
pipelines, and a fractionation unit and offshore facilities for shipment of
LPG and condensate products.
Photograph courtesy of Hitachi
Posted 1 Oct 2006 |
Grati
Location: East Java
Operator: PT Indonesia Power
Configuration: 2 X 462-MW, 3+1 CCGT blocks with M701D gas turbines
Fuel: heavy oil
Operation: 1995-1997
HRSG supplier: CMI
T/G supplier: MHI, Melco, Siemens
EPC: Monenco, PT Wijaya Karwa
Quick facts: Grati is on a 70ha hectare site
in Pasuruan, of which half is reclaimed land.
Photograph courtesy of PT Indonesia Power
Posted 28 Jun 2008 |
Muara Karang CC
Location: Jakarta Raya
Operator: PT Pembangkitan Jawa-Bali
Configuration: 450-MW, 3+1 CCGT with 9001E gas
turbines, 2 X 240-MW M701F gas turbines repowering 3 X 100-MW steam sets
Fuel: natural gas, diesel oil
Operation: 1993-2011
HRSG supplier: Biro, MHI
T/G supplier: GE, Toshiba, MHI
EPC: Sumitomo, B&V, PCI, MHI, Truba, PT Wijaya Karwa
Quick facts: GE received the order from prime contractor Sumitomo for three dual-fuel gas 9001E turbines for Muara Karang and a 150-MW steamer was was added in 1994. In Jul 2007, MHI received a turnkey order to repower three old 100-MW steam sets with two gas turbines.
Photograph courtesy of PT Wijaya Karwa
Posted 17 Dec 2010 |
Palembang Timur
Location: South Sumatra
Operator: PT Asrigita Prasarana
Configuration: 150-MW, 1+1 CCGT blocks with 9001E gas turbine
Fuel: natural gas, diesel oil
Operation: 2004-2005
HRSG supplier: Hangzhou
T/G supplier: GE, Harbin
EPC: China National Chemical Engineering Corp, Chengda Engineering Corp
Quick facts: This was one of China's first large-scale BOOT projects and is jointly-invested by China National Chemical Engineering Corp, Chengda Engineering Corp, and PT Sumbergas Sakti Prima. Simple-cycle operation began on 2 Sep 2004 after about 4yrs of development and preparation and 22mos of construction.
Photograph courtesy of PT Asrigita Prasarana
Posted 2 Sep 2012 |
Samarinda
Location: East Kalimantan
Operator: PT PLN
Configuration: 60-MW, 2+1 CCGT with RB211 gas turbines
Fuel: natural gas, oil
Operation: 1999
HRSG: ICL
T/G supplier: Rolls-Royce, WH Allen, Peebles
EPC: Rolls-Royce, PT Silkar National
Quick facts: This plant was built at a remote location on the south bank
of the Mahakam River in East Kalimantan. Over 90% of the equipment was
delivered by barge. The turnkey project included transformers, a 150kV
switchyard, DCS, water treatment and cooling water systems, plus fuel
supply and storage facilities. A second similar block was added in 2004.
Photograph courtesy of Rolls-Royce
Posted 8 Aug 2007 |
|
Sengkang
Location: South Sulawesi
Operator: PT Energi Sengkang
Configuration: 150-MW, 2+1 CCGT with GT8C gas turbines
Fuel: natural gas, oil
Operation: 1997-1998
HRSG: ABB
T/G supplier: ABB
EPC: ABB, Indo-East Engineering & Construction
Quick facts: This plant was ordered in late 1996 by a then-JV of PT Trihasra Sarana Jaya Purnama,
Energy Equity Corp, and Tenneco Holdings Pty Ltd. It
is now 100% owned by Energy World Corp and fires gas from the Sengkang
Block in South Sulawesi. A 60-MW Siemens
gas turbine was added in 2008.
Photograph by tegarsuseno (Panoramio)
Posted 14 Apr 2010 |
Tambak Lorok CC
Location: Central Java
Operator: PT Indonesia Power
Configuration: 2 X 530-MW, 3+1 CCGT blocks with 9001E gas turbines
Fuel: natural gas, diesel oil
Operation: 1993-1998
HRSG supplier: Biro
T/G supplier: GE
EPC: B&V, Sumitomo, Hazama
Quick facts: The 150kV plant switchyard is connected to the Pandean,
Krapyak, and Ungaran substations.
Photograph courtesy of PT Indonesia Power
Posted 17 Oct 2010
|
Tanjung Priok
Location: Jakarta Raya
Operator: PT Indonesia Power
Configuration: 2 X 590-MW, 3+1 CCGT blocks with GT11E gas turbines
Fuel: natural gas
Operation: 1993-1994
HRSG supplier: CMI
T/G supplier: ABB
EPC: ABB, Taihei Dengyo Kaisha
Quick facts: The site also has four small decommissioned steam sets (2 X
22 MW, 2 X 45 MW) and several small simple-cycle gas turbines. At one time,
there was a proposal to relocate the 45-MW steam sets to North Bali. A
third CCGT block is in planning.
Photograph courtesy of PT Indonesia Power
Re-posted 28 Jun 2008 |