CCGT Plants in Iran - Bushehr & Fars
Fars
Location: Fars
Operator: Fars Regional Electric Power Co
Configuration: Three, 345-MW, 2+1 CCGT blocks with 9001E gas turbines
Fuel: natural gas, oil
Operation: 1995-2002
HRSG supplier: Doosan
T/G supplier: John Brown, GEC-Alstom, Siemens
EPC: Marubeni, Unit, John Brown, Mapna
Quick facts: The plant has a Heller dry cooling system and is connected to the grid through a 230kV switchyard.

Photograph courtesy of Mapna
Posted 31 Jul 2005

Kazerun
Location: Fars
Operator: South Fars Power Generation
Configuration: 410-MW, 2+1 CCGT with M701D gas turbines, two 480-MW, 2+1 CCGT blocks with V94.2 gas turbines
Fuel: natural gas, oil
Operation: 1995-2008
HRSG supplier: Doosan, Mapna
T/G supplier: MHI, Ansaldo, Melco, Tuga, Pars
EPC: Ghods Niroos, Mapna, Monenco Iran
Quick facts: >Development of this 94has site started in 1989. The combined-cycle extension cost $520mn.

Photograph courtesy of Tavanir
Re-posted 13 Jun 2012

Mobin
Location: Boushehr
Operator: Mobin Petrochemical Co
Configuration: 6 X 123 MW 9001E gas turbines CHP
Fuel: natural gas, oil
Operation: 2005
T/G supplier: GE
EPC: Mapna
Quick facts: The Mobin plant EPC contract was awarded in Apr 2002 and includes six fired HRSGs each with 330 tph capacity. The plant has a 132kV substation.

Photograph courtesy of Mapna
Posted 31 Jul 2005