CCGT Plants in Nigeria
|
![]() |
![]() |
|
Alaoji Location: Abia Operator: Power Holding Co of Nigeria plc Configuration: 4+2 CCGT block with 9001E gas turbines Operation: 2011 Fuel: natural gas HRSG: ?? T/G supplier: GE EPC: Burns & McDonnell, Rockson Quick facts: The $744mn Alaoji project has been delayed by logistical difficulties.
Photograph courtesy of Rockson Engineering Co Ltd |
Delta-II Location: Delta Operator: Power Holding Co of Nigeria plc Configuration: 6 X 23.8 MW H-25 gas turbines Operation: 2002 Fuel: natural gas T/G supplier: Hitachi Quick facts: These machines replaced six existing gas turbines and the project took about 12mos to implement.
Photograph courtesy of Hitachi |
Egbema Location: Imo Operator: Power Holding Co of Nigeria plc Configuration: 3 X126 MW 9001E gas turbines Operation: 2011 Fuel: natural gas T/G supplier: GE EPC: Rockson Quick facts: The N26.5bn Egbema project was approved in Apr 2006 as one of the seven Niger Delta plant awarded by the Federal Government of Nigeria under the National Integrated Power Project (NIPP). Egbema is about 30km from Owerri. The project has been delayed by lack of access to natural gas and transmission capacity.
Photograph courtesy of Rockson Engineering Co Ltd |
![]() |
![]() |
![]() |
|
Geregu Location: Kogi Operator: Power Holding Co of Nigeria plc Configuration: 3 X 170 MW SGT5-2000E gas turbines Operation: 2007 Fuel: natural gas T/G supplier: Siemens EPC: Siemens. SDEM Erectors Nigeria Quick facts: On 1 Apr 2007, President Obasanjo commissioned the Geregu Power Plant, the first brand new power plant funded and commissioned by his administration. It cost €195mn.
Photograph courtesy of www.nairaland.com |
Kolo Creek Location: Bayelsa Operator: Bayelsa State Electricity Board Configuration: 2 X 20 MW Olympus gas turbines Operation: 1983 Fuel: natural gas T/G supplier: Rolls-Royce Qucik facts: The existing machines, which are the main power supply for the entire state, were refurbished in 2000 and new control systems were installed in 2004/05. A 31-MW Rolls-Royce RB211 GT was installed in early 2008.
Photograph courtesy of Bayelsa State Electricity Board |
Okpai Location: Delta Operator: Nigerian Agip Oil Co Configuration: 480-MW, 2+1 combined-cycle plant with GT13E2 gas turbines Fuel: natural gas Operation: 2005 HRSG supplier: Alstom T/G supplier: Alstom EPC: Alstom, Sadelmi, Saipem Quick facts: This IPP was first proposed in 2000. Simple-cycle operation began in Apr 2005 with combined-cycle operation in Sep. The plant cost about $450mn. Photograph courtesy of Sadelmi |
![]() |
||
Data: industcards, Platts UDI World Electric Power Plants Data Base
Updated 02/26/11