Alaoji Location: Abia Operator: Power Holding Co of Nigeria plc Configuration: 4+2 CCGT block with 9001E gas turbines Operation: 2011 Fuel: natural gas HRSG: ?? T/G supplier: GE EPC: Burns & McDonnell, Rockson Quick facts: The $744mn Alaoji project has been delayed by logistical difficulties.
Photograph courtesy of Rockson Engineering Co Ltd |
Delta-II Location: Delta Operator: Power Holding Co of Nigeria plc Configuration: 6 X 23.8 MW H-25 gas turbines Operation: 2002 Fuel: natural gas T/G supplier: Hitachi Quick facts: These machines replaced six existing gas turbines and the project took about 12mos to implement.
Photograph courtesy of Hitachi |
Egbema Location: Imo Operator: Power Holding Co of Nigeria plc Configuration: 3 X126 MW 9001E gas turbines Operation: 2011 Fuel: natural gas T/G supplier: GE EPC: Rockson Quick facts: The N26.5bn Egbema project was approved in Apr 2006 as one of the seven Niger Delta plant awarded by the Federal Government of Nigeria under the National Integrated Power Project (NIPP). Egbema is about 30km from Owerri. The project has been delayed by lack of access to natural gas and transmission capacity.
Photograph courtesy of Rockson Engineering Co Ltd |
![]() |
![]() |
![]() |
|
Geregu-I Location: Kogi Operator: Power Holding Co of Nigeria plc Configuration: 3 X 140 MW SGT5-2000E gas turbines Operation: 2007 Fuel: natural gas T/G supplier: Siemens EPC: Siemens. SDEM Erectors Nigeria Quick facts: On 1 Apr 2007, President Obasanjo commissioned the Geregu Power Plant, the first brand new power plant funded and commissioned by his administration. It cost €195mn.
Photograph courtesy of www.nairaland.com |
Ihovbor-Eyaen Photograph courtesy of Chevron Gas |
Kolo Creek Photograph courtesy of Bayelsa State Electricity Board |
![]() |
![]() |
![]() |
| Okpai Location: Delta Operator: Nigerian Agip Oil Co Configuration: 480-MW, 2+1 combined-cycle plant with GT13E2 gas turbines Fuel: natural gas Operation: 2005 HRSG supplier: Alstom T/G supplier: Alstom EPC: Alstom, Sadelmi, Saipem Quick facts: This IPP was first proposed in 2000. Simple-cycle operation began in Apr 2005 with combined-cycle operation in Sep. The plant cost about $450mn. Photograph courtesy of Sadelmi |
Olorunsogo-I Location: Ogun Operator: Niger Delta Power Holding Co Ltd Configuration: 8 X 38-MW 6001B gas turbines Fuel: natural gas, oil Operation: 2007 T/G supplier: Nanjing EPC: SEPCO No 3 Quick facts: In Mar 2002, CMEC and SEPCO No 3 announced a $390mn agreement with the Ministry of Mines and Power to build two gas-fired, gas turbine power plants with a total capacity of 670 MW. The deal also included the construction of related substations and transmission lines and assistance in plant operations. The Olorunsogo plant in Ogun is 70km west of Lagos. Ground-breaking was in Sep 2004 and full construction started in Mar 2005. China ExIm Bank supplied a N24bn loan for the projects. The plant, also known as Papalanto, has had a checkered operational history and has had insufficient gas deliveries. Photograph courtesy of SEPCO No 3 |
Olorunsogo-II Location: Ogun Operator: Niger Delta Power Holding Co Ltd Configuration: two 342-MW, 2+1 CCGT blocks with 9001E gas turbines Fuel: natural gas, oil Operation: 2012-2014 HRSG supplier: Wuxi T/G supplier: GE, Harbin EPC: SEPCO No 3 Photograph courtesy of SEPCO No 3 |
![]() |
![]() |
|
Omotosho-II Photograph courtesy of Chevron Gas |
Sapele Photograph courtesy of Chevron Gas |
|
![]() |
||
Data: industcards, Platts UDI World Electric Power Plants Data Base