CCGT Plants in Portugal
Alto de Mira
Location: Lisboa
Operator: EDP Producao
Configuration: 6 x 33 MW 5001P gas turbines
Fuel: natural gas, oil
Operation: 1975
T/G supplier: GE, Alsthom

Photograph courtesy of EDP Producao
Posted 5 May 2004

Lares
Location: Coimbra
Operator: EDP Producao
Configuration: 2 x 431 MW single-shaft CCGT blocks with 9001FB gas turbines
Fuel: natural gas
Operation: 2009
HRSG supplier: Doosan
T/G supplier: GE
EPC: GE, Cobra, CME
Quick facts: In May 2007, EDP awarded a turn-key contract for the Lares CCGT in Figueira da Foz to a consortium of GE Energy, Cobra, and CME. Construction got underway shortly thereafter. The first unit went online in Aug 2009 and the plant was fully commissioned the following month at a cost of 405mn.

Photograph courtesy of EDP Producao
Re-posted 2 Dec 2009

Pego CC
Location: Santarem
Operator: ElecGas SA
Configuration: 2 x 415 MW single-shaft CCGT blocks with SGT5-4000F gas turbines
Fuel: natural gas
Operation: 2011
HRSG supplier: NEM
T/G supplier: Siemens
EPC: Siemens, Carbonell Figueras
Quick facts: The Pego site was originally sized for two additional conventional units, but in 2002, Tejo Energia completed an EIA for deployment of a pair of 400-MW combined-cycles instead. The public inquiry period expired in Jan 2003 without incident and, in Mar 2008, International Power successfully completed the financing of the project. Other key agreements, including a tolling contract and an EPC contract, were signed at the same time and the production license was received in Apr 2008. The plant is owned and operated by a 50:50 joint venture of International Power and Endesa snf shares cooling water infrastructure and other services with the Pego coal-fired plant. The total project cost was estimated to be €580mn, funded by an 85:15 mix of debt and equity. PB Power was owner's engineer. The entire output is sold to Endesa Generacion SA under a 25yr tolling contract.

Photograph courtesy of Endesa SA
Posted 1 Jan 2013

Ribatejo
Location: Lisboa
Operator: EDP Producao
Configuration: 2 x 392 MW single-shaft CCGT blocks with V94.3A gas turbines
Fuel: natural gas
Operation: 2003-2004
HRSG supplier: NEM
T/G supplier: Siemens
EPC: Siemens

Photograph by Adelino Oliveira and courtesy of EDP Producao
Re-posted 17 Feb 2007

Sines Refinery
Location: Setubal
Operator: Galp Energia
Configuration: 2 x 41 MW PG6581 gas turbines CHP
Fuel: natural gas
Operation: 2009
HRSG supplier: Foster Wheeler Iberia
T/G supplier: GE, Brush
EPC: CME, SMM , Tractebel
Quick facts: In Aug 2006, Galp awarded the EPC contract for this CHP plant to CME and the plant commissioned in Oct 2009. The HRSGs have a capacity of 250 tph of steam. SMM was a mechanical subcontractor and Tractebel Engineering was a consultant on the project.

Photograph courtesy of Galp Energia
Posted 20 Jan 2010

Tapada do Outeiro
Location: Coimbra
Operator: Turbogas Produtora Energetica SA
Configuration: 3 x 330 MW single-shaft CCGT blocks with V94.3A gas turbines
Fuel: natural gas, oil
Operation: 1998-1999
HRSG supplier: NEM
T/G supplier: Siemens
EPC: Siemens, Koch
Quick facts: These were the first HRSGs with a vertical gas path and new natural circulation technology. The HRSGs have three pressure levels and reheat.

Photograph courtesy of Turbogas Produtora Energetica SA
Posted 1 May 2004

   

Tunes
Location: Faro
Operator: EDP Producao
Configuration: 2 x 16 MW 5001MP, 2 X 83 MW 9001 BTG gas turbines
Fuel: natural gas, oil
Operation: 1973-1983
T/G supplier: GE, Alsthom, Sorefame

Photograph courtesy of EDP Producao
Posted 5 May 2004

Abbreviations

Data: industcards, Platts UDI World Electric Power Plants Data Base