CCGT Plants in Russia - other Federal Districts
Kyzyl Substation
Location: Tuva Republic (Siberian FD)
Operator: Mobile GTES JSC
Configuration: 2 X 22.5 MW FT8 MobilePak
Fuel: natural gas
Operation: 2009
T/G supplier: P&W
Quick facts: These machines were relocated from the Moscow area to cope with regional electricity shortages resulting from the catastrophic accident at Sayano-Shushenskaya hydroelectric plant in Aug 2009.

Photograph courtesy of Mobile GTES JSC
Posted 2 Jan 2010

Nevinnomyssk CC
Location: Stavropol Krai (North Caucasus FD)
Operator: OJSC Enel OGK-5
Configuration: 410-MW,1+1 CCGT with SGT5-4000F gas turbine
Operation: 2011
Fuel: natural gas
HRSG supplier: CMI
T/G supplier: Siemens
EPC: Enel, Atomstroyexport, Teploelektroprojekt
Quick facts: In Nov 2008, OGK-5 began construction on a PGU-410 block at Nevinnomysskaya, the region's first full-size CCGT plant. The new block was commissioned on 15 Jul 2011. The project was supported by EBRD which provided €120mn in long-term credit. The total investment was about Ru16bn.

Photograph courtesy of Enel SpA
Posted 9 Apr 2014

Oceanarium
Location: Primorsky Krai (Far East)
Operator: Far East Energy Management Co
Configuration: 1 X 6.6 MW, 1 X 5.8 MW GPB-70 gas turbinesCHP
Operation: 2013
Fuel: natural gas, diesel oil
T/G supplier: Kawasaki Heavy Industries
Quick facts: In Oct 2013, DVEUK completed this small CHP power station at the Vladivostok City Oceanarium. It has two KHI gas turbines supplied by Sojitz Corp.

Photograph courtesy of Far East Energy Management Co
Posted 5 Mar 20142 Sep 2013

Stavrolen
Location: Stavropol Krai (North Caucasus FD)
Operator: OAO LUKOIL
Configuration: 133-MW, 2+1 CCGT with Trent 60 gas turbines CHP
Fuel: associated gas
Operation: 2015
Boiler supplier: Podoloski
T/G supplier: Rolls Royce, Siemens
EPC: Synergetic Projects
Quick facts: In Jun 2012, Lukoil ordered gas turbines for a new cogen power plant at its Stavrolen petrochem complex block at Budennovsk. Design fuel is dry gas from Luokil oil production activities in the North Caspian region. Heating capacity is 58 Gcal/hr. Construction began in Mar 2013 and pre-operational testing completed in Dec 2014.

Photograph courtesy of neftegaz.ru
Posted 25 Mar 2015

Vladimir-2 CC
Location: Vladimir (Far East)
Operator: TGK-6
Configuration: 230-MW, 1+1 CCGT with GTE-160 gas turbine CHP
Fuel: natural gas, fuel oil
Operation: 2014
Boiler supplier: Taganrog
T/G supplier: LMZ, Electrosila
EPC: E4 Group
Quick facts: In Apr 2012, TGK-6 began construction on this CCGT block at the Vladimir-2 power station. Testing began in the fall of 2013. Sberbank Rossii provided a 6.5bn ruble line of credit for the Ru9.4bn project.

Photograph courtesy of TGK-6
Posted 5 Mar 2014

Yakutsk-2
Location: Sakha Republic (Yakutia)
Operator: Yakutskenergo
Configuration: 4 X 35 MW, 4 X 45 MW CHP
Operation: 1976-2004
Fuel: natural gas, diesel oil
T/G supplier: LMZ, TMZ
Quick facts: Four old 25-MW GTs at Yakutsk were changed out in 2004. New 80-MW gas turbines are planned to replace all the old machines,

Photograph courtesy of JSC RAO Energy System of East
Posted 2 Sep 2013

Yuzhno Khyl'chuyu
Location: Nenets AO (Northern FD)
Operator: OAO Lukoil
Configuration: 6 X 25-MW SGT-600 gas turbines CHP
Operation: 2008-2013
Fuel: natural gas
T/G supplier: SIemens
EPC: OOO Energoperspektiva NNP
Quick facts: Gas- and oil-field project built for Lukoil unit Naryanmarneftegaz.

Photograph courtesy of OOO Energoperspektiva NNP
Posted 17 Aug 2014

Yuzhno-Priobskaya Phase I
Location: Khanty-Mansi AO (Siberian FD)
Operator: JSC Gazprom Neft
Configuration: 4 X 12 MW EGES-12S gas turbines CHP
Operation: 2009
Fuel: natural gas
T/G supplier: Iskra, Privod
Quick facts: In Dec 2009, Iskra-Energetika completed Phase-I of a captive gas turbine power plant at Jthe s Yuzhno-Priobskaya gas field field in Nefteyugansk. First piling was in January 2009. The 48-MW plant uses power units packaged by by Iskra using GTU-12PG gas turbines manufactured by Perm Motor Plant. A second phase followed in 2010.

Photograph courtesy of Iskra
Posted 19 Mar 2014

Yuzhno-Sakhalinsk GT
Location: Sakhalin Oblast (Far East FD)
Operator: Sakhalinenergo
Configuration: 5 X 46-MW LM6000 gas turbines CHP
Operation: 2012
Fuel: natural gas, diesel oil
T/G supplier: GE
EPC: GE
Quick facts: The final machine of these 5 new GTs went online in Aug 2012.,

Photograph courtesy of JSC RAO Energy System of East
Posted 24 Jul 2016