CCGT Power Plants in Russia - other Federal Districts
Adlerskaya
Location: Krasnodar Krai (Southern FD)
Operator: OGK-2
Configuration: Two 192-MW, 2+1 CCGT blocks with V64.3A gas turbines CHP
Operation: 2012
Fuel: natural gas
HRSG supplier: Podoloski
T/G supplier: Ansaldo, Kaluga, Electrosila
EPC: Mosenergo
Quick facts: Construction on the Adlerskaya project began in Sep 2009 and is one of many infrastructure projects related to the 2014 Winter Olympic Games. The 9.9ha site is in the Imereti Valley. The project was commissioned in Dec 2012.

Photograph courtesy of Youri Stepanov
Re-posted 3 Mar 2013

Kaliningrad TETS-2 Phase I
Location: Kaliningrad (Northewestern FD)
Operator: Inter RAO UES
Configuration: 470-MW, 2+1 CCGT block with GTE-160 gas turbines CHP
Operation: 2005
Fuel: natural gas
HRSG supplier: Podoloski
T/G supplier: Siemens
EPC: Teploelektroproekt, Tsentrenergomontazh
Quick facts: This site is on the southeastern outskirts of the city of Kaliningrad. Project development began in Apr 1991 when the city government began assembling the necessary property. In 1994, the regional administration decided to double the plant size and VNIPIEnergoprom completed the feasibility study for the extension. In 1998, the project company was reorganized with RAO UES holding 67.3% and Yantarenergo the balance. Phase I was bid in 2002 and Belenergostroy (now Tsentroenergomontazh) was selected as the general contractor while Energomashexport-Power Machines was awarded the equipment contract. Construction started in Q4 2002 and production began on 28 Oct 2005.

Photograph courtesy of Kalininigrad TETS 2
Posted 27 Mar 2010

Khasyreiskoye Field
Location: Nenets AO (Northewestern FD)
Operator: NK Rosneft
Configuration: 2 X 4.7 MW Typhoon, 3 X 7.9 MW Tempest gas turbines
Operation: 2004-2007
Fuel: flare gas
T/G supplier: Alstom
EPC: ILF, Energotech, Stroimontazh
Quick facts: These machines run on high-sulphide flare gas at the Khasyreiskoye oil field.

Photograph courtesy of Energotech
Posted 3 Oct 2012

Kirishi SDPP CC
Location: Leningrad (Northwestern FD)
Operator: OGK-2
Configuration: 818-MW, 2+1 CCGT block with SGT5-4000F gas turbines CHP
Operation: 2012
Fuel: natural gas
HRSG supplier: Podoloski
T/G supplier: Siemens, LMZ, Electrosila
EPC: JSC EMA - EMAlliance, SZEM JSC.
Quick facts: This project involved repowering Unit-6 (online 1975) at the eixsting conventional power station, which is located 150km southwest of St Petersburg. Siemens supplied the GTs and generators and new control systems. Construction began in May 2008 and the project was commissioned on 23 Mar 2012 as the largest CCGT in Russia.

Photograph courtesy of Youri Stepanov
Posted 6 Mar 2013

Kyzyl Substation
Location: Tuva Republic (Siberian FD)
Operator: Mobile GTES JSC
Configuration: 2 X 22.5 MW FT8 MobilePak
Fuel: natural gas
Operation: 2009
T/G supplier: P&W
Quick facts: These machines were relocated from the Moscow area to cope with regional electricity shortages resulting from the catastrophic accident at Sayano-Shushenskaya hydroelectric plant in Aug 2009.

Photograph courtesy of Mobile GTES JSC
Posted 2 Jan 2010

Pravoberezhnaya (St Petersburg-5)
Location: St Petersburg (Northewestern FD)
Operator: TGC-1
Configuration: 470-MW, 2+1 CCGT block with GTE-160 gas turbines CHP
Operation: 2012
Fuel: natural gas
HRSG supplier: Podoloski
T/G supplier: Siemens, LMZ, Electrosila
EPC: Trest Sevzapenergomontazh
Quick facts: This project was ceremonially commissioned on 23 Nov 2012. It is the third large-scale CCGT built by Gazprom companies in the St Petersburg area in recent years. Pravoberezhnaya supplies energy to industrial, residential and municipal users in the Nevsky and Krasnogvardeisky districts with a population of some 700,000.

Photograph courtesy of Gazprom
Posted 1 Dec 2012

Severo-Zapadnay
Location: Leningrad (Northwestern FD)
Operator: JSC INTER RAO UES
Configuration: Two 450-MW, 2+1 CCGT blocks  with V94.2 gas turbines
Operation: 2001-2006
Fuel: natural gas
HRSG supplier: CMI, Podoloski
T/G supplier: Siemens, LMZ, Electrosila
Quick facts: This was Russia's first modern combined-cycle and was designed to comprise four blocks in total.

Photograph courtesy of Siemens AG
Posted 28 Apr 2001

Sochinskaya
Location: Krasnodar Krai (Southern FD)
Operator: JSC INTER RAO UES
Configuration: Two 38-MW, 1+1 CCGT blocks with GT10C gas turbines CHP
Operation: 2004
Fuel: natural gas
HRSG supplier: Podoloski
T/G supplier: Siemens, Kaluga, Electrosila
Quick facts: At completion, this was the third modern combined-cycle plant in Russia. The plant is located in a resort area characterized by complex soils and high seismicity and was designed, built and commissioned in two years. The plant is now being extended to support the 2014 Winter Olympics.

Photograph courtesy of Siemens AG
Posted 14 Jun 2006

Yayvinskaya CC
Location: Perm (Volga FD)
Operator: E.ON Russia
Configuration: 400-MW single-shaft CCGT with SGT5-4000F gas turbine
Operation: 2011
Fuel: natural gas
HRSG supplier: CMI
T/G supplier: Siemens
EPC: Enka
Quick facts: In May 2008, Enka was slected to this build CCGT after an open competition anounced in 2007. It extended a conventional 600-MW thermal plant first commissioned in 1963. Construction began in Q3, 2008, and testing began in Jun 2011. The new block was commissioned on 21 Sep 2011 and cost 16.6bn rubles (excluding VAT).

Photograph courtesy of E.ON Russia
Posted 25 Sep 2011

   

Yugo-Zapadnaya
Location: Leningrad (Northwestern FD)
Operator: Yugo-Zapadnaya TETZ
Configuration: 188-MW, 2+1 CCGT with V64.3A gas turbines CHP
Operation: 2011
Fuel: natural gas, oil
HRSG supplier: Podoloski
T/G supplier: Ansaldo, Siemens
EPC: St Petersburg Atomenergoproekt, OAO Stroytransgaz
Quick facts: Development of this project began in 2006 and the facility serves new residential and commerical customers in the Kirov and Krasnoselsky areas of St Petersburg. The brownfield 24.2ha site is in part a former ash dump of Leningrad-14 power station. In addition to the CCGT block, the plant has two hot water boilers. A second phase is under construction. The development company is part of Sintez Petroleum.

Photograph by tisokol (Panoramio)
Posted 6 Mar 2013

Abbreviations

Data: industcards, Platts UDI World Electric Power Plants Data Base