Pulau Sakra Location: Singapore Operator: SembCorp Utilities Configuration: 815-MW, 2+1 CCGT with 9001FA++ gas turbines CHP Fuel: natural gas Operation: 2001 HRSG supplier: Alstom T/G supplier: GE Quick facts: The SembCogen plant is Singapore’s first IPP and the first project-financed, merchant power plant in Asia. In addition to electricity, the plant supplies up to 700 t/hr of steam to industrial users on Jurong Island.
Photograph courtesy of SembCorp Industries Ltd |
Senoko Location: Singapore Operator: SenokoPower Ltd Configuration: 4 X 250 MW conventional sets, two 424-MW, 2+1 CCGT blocks with V94.2 gas turbines, three 355-MW 1+1 CCGT with GT26B gas turbines (repower) Fuel: natural gas Operation: 2000 HRSG supplier: Biro, CMI T/G supplier: Hitachi, Siemens, Alstom
Photograph
courtesy of PowerSenoko |
Tuas CC Location: Singapore Operator: Tuas Power Generation Pte Ltd Configuration: 4 X 367.5-MW single-shaft CCGT blocks with M701F gas turbines Fuel: natural gas Operation: 2001-2005 HRSG supplier: MHI T/G supplier: MHI EPC: B&V (Units 1&2), MHI (Units 3&4) Quick facts: Gas for the first two blocks is from Indonesia’s West Natuna field and Units 3&4 use gas from South Sumatra.
Photograph courtesy of Tuas Power Generation Pte Ltd |
![]() |
||
|
Tuas Pfizer Location: Singapore Operator: TPGS Green Energy Pte Ltd Configuration: 1 X 5-MW Taurus 60 gas turbine CHP Fuel: natural gas Operation: 2007 T/G supplier: Solar, Leroy Somer EPC: Turbomach Quick facts: In Nov 2006, TPGS and Pfizer Asia Pacific started construction on this trigeneration plant at Pfizer’s facility in Tuas Biomedical Park. The installation cost S$8mn and was developed and constructed by TPGS, a joint venture company of Tuas Power Ltd and Gas Supply Pte Ltd, which also holds a 15yr O&M agreement with Pfizer. The plant was handed over on 30 Oct 2007.
Photograph
courtesy of TPGS Green Energy Pte Ltd |
||
![]() |
||
Data: industcards, Platts UDI World Electric Power Plants Data Base