Gas Turbine and Combined-Cycle Plants in Spain - Other Regions

Arrubal
Location: La Rioja
Operator: Gas Natural SDG SA
Configuration: 2 X 400 MW single-shaft combined-cycle blocks with V94.3A gas turbines
Fuel: natural gas, gasoil
Operation: 2004
HRSG supplier: Nooter
T/G supplier: Siemens
EPC: Siemens
Quick facts: The project was approved in May 2003 and cost about
370mn.

Photograph courtesy of Gas Natural SDG SA
Posted 9 Nov 2005

Barranco de Tirajana
Location: Islas Canarias
Operator: Endesa
Configuration: 2 X 210 MW, 2+1 combined-cycle blocks with 6001FA gas turbines
Fuel: diesel oil
Operation: 2003-2007
HRSG supplier: Babock Borsig Power
T/G supplier: GE, Siemens
EPC: Duro Felguera

Photograph courtesy of Hitachi Europe
Posted 9 Mar 2007

Castejon
Location: Navarra
Operator: HC Energia
Configuration:
1 X 400 MW single-shaft combined-cycle block with GT26B gas turbine
Fuel: natural gas
Operation: 2003
HRSG supplier: CMI
T/G supplier: Alstom
EPC: Alstom, Duro Felguera
Quick facts: A second block was added in 2008.

Photograph courtesy of Alstom Power
Posted 20 Mar 2004

Castelnou
Location: Teruel
Operator: Electrabel Espana SA
Configuration: 800-MW, 2+1 combined-cycle with M701F3 gas turbines
Fuel: natural gas
Operation: 2006
HRSG supplier: CMI
T/G supplier: MHI, Melco
EPC: Incitec, Dragados
Quick facts: Construction started on 27 Oct 2003 and commercial operations began on 5 Jul 2006. The plant cost €320mn.

Photograph courtesy of Suez
Posted 21 Feb 2007

Enercrisa
Location: Burgos
Operator: Enercrisa (Iberdrola)
Configuration: 1 x 15 MW MF111B gas turbine CHP
Fuel: natural gas
Operation: 1994
T/G supplier: MHI, Tuma
Quick facts: This installation supplies power and steam to the world's largest glauberite mine (sodium calcium sulfate), a mineral used in dying, solar cells, and medicine.

Photograph courtesy of Grupo Crimidesa
Posted 6 Aug 2005

Escatrón
Location: Zaragoza
Operator: Global 3 Energia SPCA
Configuration: Two 140-MW, 2+1 CCGT blocks with LM6000P gas turbines
Fuel: natural gas
Operation: 2007-2008
HRSG supplier: Innovative
T/G supplier: GE
EPC: GE, Heymo Ingeniería
Quick facts: This site comprises 40ac near the Ebro River. The plant cost about
300mn and was delayed approximately two years. Development started in Nov 2003.

Photograph courtesy of Global 3 Energia SPCA
Posted 10 Sep 2008

 

Granadilla
Location: Islas Canarias
Operator: Endesa Unelco
Configuration: 210-MW, 2+1 CCGT with 6001FA gas turbines
Fuel: oil
Operation: 2003-2005
HRSG supplier: NEM
T/G supplier: GE
EPC: Tecnicas Reuindas,
Empresarios Agrupados
Quick facts:
This plant was ordered in Apr 2003. The gas turbines were sourced from Belfort, France, and the steam set from Schenectady, NY. A second phase is planned and the plant will be converted to gas when a planned LNG terminal is completed.

Photograph courtesy of Endesa
Posted 26 Mar 2006

  Son Reus
Location: Islas Baleares
Operator: Endesa
Configuration: 1 x 150 MW, 2+1 combined-cycle block with 6001B gas turbines, 1 X 210 MW, 2+1 combined cycle block with 6001FA gas turbines
Fuel: diesel oil
Operation: 2000-2005
HRSG supplier: CMI, NEM
T/G supplier: Alstom, GE, Siemens
EPC: Alstom, Idom, Duro Felguera

Photograph courtesy of Hitachi Europe
Posted 9 Mar 2007

Abbreviations:  ACS = Actividades de Construccion y Servicios, BWE = Babcock & Wilcox Espanola, CC = combined-cycle, CHP = combined-heat-and-power, GE = General Electric , GT = gas turbine, HRSG = heat recovery steam generator, IPP = independent power plant, LNG = liquefied natural gas, MHI = Mitsubishi Heavy Industries, T/G = turbine generator

Data: industcards, Platts UDI World Electric Power Plants Data Base

Updated 11/08/08