CCGT Plants in Uruguay
 
La Tablada
Location: Uruguay
Operator: UTE
Configuration: 2 X 115 MW 9001E gas turbines
Fuel: distillate oil
Operation: 1991-1992
T/G supplier: GE
EPC: GE, Techint

Photograph courtesy of Admin Nac de Usinas y Trans Elec (UTE)
Posted 7 Feb 2004

Punta del Tigre
Location: Uruguay
Operator: UTE
Configuration: 6 X 50 MW LM6000 Sprint gas turbines
Fuel: distillate oil
Operation: 2006-2007
T/G supplier: GE
EPC: GE
Quick facts: In Nov 2005, GE was awarded a $73mn contract for the first phase of this fast-track project with four GTs. The plant has a 150kV switchyard.

Photograph courtesy of Admin Nac de Usinas y Trans Elec (UTE)
Posted 9 Mar 2011