CCGT Plants in the USA - Alaska
Beluga
Location: AK
Operator: Chugach Electric Association
Configuration: 210-MW, 2+1 CCGT with GT11DM gas turbines, 2 X 20 MW Frame 5, 2 X 70 MW Frame 7 gas turbines
Operation: 1967-1981
Fuel: natural gas
HRSG supplier: B&W
T/G supplier: GE, BBC, Dresser
Quick facts: Chugach Electric started-up in 1948 with a salvaged tanker power plant and is now the largest power company in the state. The Beluga plant is sited at a small gas field and has one of the northernmost combined-cycle blocks in the world. The remote site is 40mi across Cook Inlet from Anchorage and is only accessible by barge or air. Over the years, plant operators have installed a  variety of specialized machinery and materials to facilitate onsite maintenance and repairs.

Photograph courtesy of Power
Posted 18 Mar 2006

Delta Junction GT 6
Location: AK
Operator: Golden Valley Electric Association
Configuration: 27-MW Frame 5 gas turbine
Operation: 1976
Fuel: diesel oil
T/G supplier: John Brown, Brush
EPC: ESI Energy Services Inc
Quick facts: This GT has a unique enclosure and heating system and was built in 7mos.

Photograph courtesy of ESI Energy Services Inc
Posted 21 Jan 2017

George M Sullivan
Location: AK
Operator: Anchorage Municipal Light and Power
Configuration: 1 X 38 MW W251 gas turbine, 1 X 103 MW, 1 X 93 MW 7001E gas turbines, 1 X 33 MW steam set
Operation: 1975-1984
Fuel: natural gas
HRSG supplier: Vogt
T/G supplier: WH, GE, John Brown
Quick facts: ML&P is owned and operated by the Municipality of Anchorage and has been providing power to Anchorage since 1932, when the City purchased a distribution system. ML&P is a vertically integrated utility and also owns one-third of the Beluga River Gas Field.

Photograph courtesy of Anchorage Municipal Light and Power
Posted 19 Sep 2007

 
North Pole
Location: AK
Operator: Golden Valley Electric Association
Configuration: 60-MW, 1+1 CCGT with LM6000 gas turbine, 2 X 60 MW Frame 7 gas turbines
Operation: 1976-2007
Fuel: naphtha, oil
HRSG supplier: IST
T/G supplier: GE, Thermodyn
EPC: Haskell, H C Price
Quick facts: Construction started on the North Pole CCGT expansion project on 30 Aug 2004 and performance and reliability testing concluded on 7 Mar 2007. The plant burns naphtha from the nearby Flint Hills Resources refinery, Alaska’s largest, and is gas-capable. The $74.9mn expansion project was necessitated by additional GVEA loads from the U.S. Strategic Missile Defense System, Pogo Gold Mine, and Alyeska Pump Station #9. The new CT has a water injection system and a carbon monoxide oxidation catalyst.

Photograph courtesy of Golden Valley Electric Association
Posted 29 Aug 2007

Southcentral
Location: AK
Operator: Chugach Electric Association
Configuration: 200-MW, 3+1 CCGT with LM6000PF gas turbines CHP
Operation: 2013
Fuel: natural gas
HRSG supplier: IST
T/G supplier: GE, MHI
EPC: SNC-Lavalin
Quick facts: This CCGT is a 70:30 JV of Chugach Electric and Anchorage ML&P. The plant was opened on 9 May 2013 and is the state's most efficient thermal power station. Groundbreaking was in Mar 2011 and the project was completed in January 2013. The total cost was $359mn.

Photograph courtesy of Chugach Electric Association
Posted 25 Sep 2013

Abbreviations

Data: industcards, Platts UDI World Electric Power Plants Data Base

Updated 22-Jan-2017