Broad River
Location: SC
Operator: Calpine Corp
Configuration: 5 X 170 MW 7001FA gas turbines
Operation: 2000-2004
Fuel: natural gas
T/G supplier: GE
EPC: GE, Simons Engineering, Gemma Power Systems
Quick facts: Construction on the first three machines began in Dec 1999
and mechanical completion was achieved in May 2000.
Photograph courtesy of Calpine
Posted 15 Aug 2004 |
Buck CCGT
Location: NC
Operator: Duke Power
Configuration: 620-MW, 2+1 CCGT with 7001FA gas turbines
Operation: 2011
Fuel: natural gas
HRSG supplier: Vogt
T/G supplier: GE
EPC: Shaw
Quick facts: The Buck CCGT shares a site on the Yadkin River with a mostly-retired coal-fired plant. In May 2008, Duke signed a $275mn EPC contract with Shaw Group for the new facility. It went into operation to schedule in Nov 2011.
Photograph courtesy of Duke Power
Posted 18 Mar 2012 |
Columbia Energy
Location: SC
Operator: Calpine Corp
Configuration: 630-MW, 2+1 CCGT with 7001FA gas turbine CHP
Operation: 2004
Fuel: natural gas
HRSG supplier: Nooter
T/G supplier: GE, Toshiba
EPC: Calpine
Quick facts: The plant went commercial in May 2004 and was dedicated in
Jul 2004. It cost about $260mn. Process steam is supplied to Voridian and
the new plant allowed the Eastman Chemical subsidiary to shut down its
coal-fired boilers. In Mar 2008, the plant won an EPA Energy Star CHP
award.
Photograph courtesy of Combined Cycle Journal
Posted 19 Apr 2009 |
Jasper
Location: SC
Operator: South Carolina Electric & Gas
Configuration: 875-MW, 3+1 CCGT with 7001FA gas turbines
Operation: 2004
Fuel: natural gas
HRSG supplier: Nooter
T/G supplier: GE, Alstom
EPC: Duke/Fluor Daniel
Photograph courtesy of Scana Corp
Posted 12 May 2004 |
Mill Creek
Location: SC
Owner: Duke Energy Carolinas
Configuration: 8 X 80-MW 7001EA gas turbines
Operation: 2003
Fuel: natural gas, oil
T/G supplier: GE
EPC: Duke/Fluor Daniel
Quick facts: This peaking plant is in Cherokee County. In Jul 2007, the
station was the site of a successful, first-of-a-kind, EPRI-sponsored test
burn of a soybean oil diesel blend in one of the 80-MW machines.
Photograph courtesy of Combined Cycle Journal
Posted 3 Apr 2011 |
Rowan County
Location: NC
Operator: Southern Power Co
Configuration: 3 X 160 MW 7001FA gas turbines, 480-MW, 2+1 CCGT
Operation: 2001-2002
Fuel: natural gas, oil
HRSG supplier: Nooter
T/G supplier: GE, Toshiba
EPC: B&V, Parsons Energy & Chemical, Gemma Power Systems
Quick facts: In Sep 2006, the Rowan plant was sold by Progress Energy to
Southern Co for $405mn.
Photograph courtesy of Progress Energy
Posted 29 Mar 2006 |
|
|
Sherwood H Smith Jr
Location: NC
Operator: Progress Energy Carolinas
Configuration: 5 X 160 MW 7001FA gas turbines, 480-MW, 2+1 CCGT, 600-MW 2+1 CCGT
Operation: 2001-2002
Fuel: natural gas, oil
HRSG supplier: Nooter, Vogt
T/G supplier: GE, Toshiba, Siemens
EPC: B&V, Parsons Energy & Chemical, Gemma Power Systems, KBR
Quick facts: The first phases at the plant boosted the country tax base by $350mn. The third block was dedicated in Sep 2011 and
the complex renamed after Sherwood Smith, a 35yr Carolina Power & Light company veteran who retired as Chairman and CEO.
Formerly knonw as Richmond County, photo shows the first two plant phases.
Photograph courtesy of Progress Energy
Posted 29 Mar 2006 |
|