CCGT Plants in Indiana
Lawrence
Location: IN
Operator: NAES
Configuration: 6 X 43-MW LM6000  gas turbines
Operation: 2005
Fuel: natural gas, oil
T/G supplier: GE
EPC: Burns & McDonnell, PDC Harris, TIC
Quick facts: Lawrence GS began commercial operation on 1 May  2005 on a 50ac site between Bedford and Mitchell in Lawrence County. The $90mn peaking plant is jointly owned by Hoosier Energy and Wabash Valley Power Association. Construction began in Sep 2003 and required about 350,000 manhours. The plant is connected to the local 161kV grid.

Photograph courtesy of Hoosier Energy REC
Posted 17 Jan 2011

Portside
Location: IN
Operator: Primary Energy Recycling Corp
Configuration: 63-MW, 1+1 CCGT with 6001B gas turbine CHP
Operation: 1997
Fuel: natural gas
HRSG supplier: IST
T/G supplier: GE
EPC: Primary Energy
Quick facts: This project in Portage supplies electricity, process steam, and hot softened water, United States Steel's Midwest Plant.

Photograph courtesy of Primary Energy Recycling Corp
Posted 18 Jul 2012

Sugar Creek
Location: IN
Operator: LSP Power
Configuration: 561-MW, 2+1 CCGT with 7001FA gas turbines
Operation: 2002-2003
Fuel: natural gas
HRSG supplier: Vogt
T/G supplier: GE
EPC: White Construction
Quick facts: Developed by Mirant Corp and sold to LS Power as part of a six-plant package in May 2007.

Photograph courtesy of Mirant Corp
Posted 15 Jul 2003

 

Whiting
Location: IN
Operator: GE Contractual Services
Configuration: 525-MW, 2+1 CCGT with 7001FA gas turbines CHP
Operation: 2002
Fuel: natural gas, refinery offgas
HRSG supplier: ??
T/G supplier: GE
EPC: Duke/Fluor Daniel
Quick facts: The facility is owned by Nisource and sells steam to the adjacent BP Whiting Refinery. All electricity is sold on the grid.

Photograph courtesy of Combined Cycle Journal
Posted 8 May 2006

Worthington
Location: IN
Operator: NAES
Configuration: 4 X 43-MW LM6000  gas turbines
Operation: 2005
Fuel: natural gas, oil
T/G supplier: GE
Quick facts: Worthington GS was completed in Jul 2000 by Williams Energy and acquired by Hoosier Energy in Jan 2003 for $55mn. It is located on a 20ac site adjacent to Hoosier Energy's Worthington Substation in Greene Co. The plant is connected to the local 138kV grid. A black-start diesel genset was installed at Worthington in 2004.

Photograph courtesy of Hoosier Energy REC
Posted 17 Jan 2011

Abbreviations

Data: industcards, Platts UDI World Electric Power Plants Data Base

Updated 18-Jul-2012