Apex
Location: NV
Operator: LS Power
Configuration: 527-MW, 2+1 CCGT block with 7001FA gas turbines
Operation: 2003
Fuel: natural gas
HRSG supplier: Vogt
T/G supplier: GE, Alstom
EPC: Stone & Webster
Quick facts: This plant was developed by Mirant Corp and sold as part of a
six-project package to LS Power in May 2007. Apex plant connects to the Nevada Power transmission system through the Harry Allen
substation. Natural gas is supplied to the plant through the existing Kern
River pipeline. Apex has dry, low-NOx combustors with SCR which limit NOx emissions to 3.0 ppm.
Photograph by C Bergesen
Posted 10 Dec 2005 |
Clark GT
Location: NV
Operator: NV Energy
Configuration: 12 X 51.5-MW FT8-3 gas turbines
Operation: 2008-2009
Fuel: natural gas
T/G supplier: Pratt & Whitney, Brush
EPC: CH2M
Quick facts: This was considered the world's largest SwiftPac project at completion. To
make room for the installation of three nominal 200-MW blocks, the
original gas-fired units at the site were demolished. The new machines
have steam injection and Peerless SCR systems.
Photograph courtesy of Combined Cycle Journal
Posted 6 Sep 2009 |
Fernley Plant
Location: NV
Operator: Quebecor World
Configuration: 1 X 3-MW ASE40 gas turbine CHP
Operation: 2000
Fuel: natural gas
T/G supplier: AlliedSignal Power Systems, Ideal
EPC: Honeywell Engines and Systems, Mendenhall Technical Services
Quick facts: This cogeneration package is at a Quebecor
World Inc printing plant. The $5mn installation supplies electricity
and up to 60,000 lbs/hr of steam.
Photograph courtesy of Full Spectrum Communications
Posted 16 Jun 2001 |
 |
 |
 |
|
Harry Allen
Location: NV
Operator: NV Energy
Configuration: 2 X 72 MW 7001EA gas turbines
Operation: 1995-2005
Fuel: natural gas
T/G supplier: GE
EPC: UE&C, Lockwood Greene
Quick facts: The Harry Allen site is about 25mi northeast of Las Vegas. It was originally
to be developed as a 2-GW coal-fired power plant. Later the property was repurposed for eight simple-cycle GTs,
of which the first two were installed, and then for continued build out
with CCGT capacity. Unit-3 had one of GE's first, third-generation
DLN1 systems, which were designed to achieve 9 ppm NOx while the second GT was among the first
7EAs in the nation to have a sub-5-ppm NOx DLN1+ system.
Photograph courtesy of Combined Cycle Journal
Posted 9 Sep 2009 |
Harry Allen CC
Location: NV
Operator: NV Energy
Configuration: 500-MW, 2+1 CCGT block with 7001FA+e gas turbines
Operation: 2011
Fuel: natural gas
HRSG supplier: Vogt
T/G supplier: GE
EPC: Shaw Group, Zachry
Quick facts: The CCGT block was approved in Oct 2008, construction got underway in the
spring of 2009,and the plant was dedicated on 4 May 2011.
Photograph courtesy of Combined Cycle
Journal
Re-posted 4 Feb 2012 |
North Las Vegas-2
Location: NV
Operator: Black Hills Corp
Configuration: Two 119-MW CCGT blocks with LM6000 gas turbines
Operation: 2003
Fuel: natural gas, oil
HRSG supplier: Innovative Steam Technologies
T/G supplier: GE, Dresser, Brush, EMC
Quick facts: Black Hills Corp owns two
separate combined-cycle blocks at this location
Phase 1 is a 1+1 combined-cycle cogen plant online in 1993 supplying
electricity to Nevada Power and hot water to an adjacent 12-acre tomato
greenhouse. Phase 2 (shown) sells electricity to Nevada Power.
Photograph by C Bergesen
Posted 13 Dec 2003 |
 |
 |
 |
|
Lenzie
Location: NV
Operator: NV Energy
Configuration: Two 600-MW, 2+1 CCGT blocks with 7001FA gas turbines
Operation: 2005-2006
Fuel: natural gas
HRSG supplier: Aalborg
T/G supplier: GE
EPC: Fluor
Quick facts: This project was started by Duke Energy. In October 2004, Nevada Power purchased the partially-constructed
plant for $182mn. Total costs to acquire and complete construction were estimated at $558mn.
Photograph by C Bergesen
Posted 11 Dec 2005 |
Silverhawk
Location: NV
Operator: NV Energy
Configuration: 570-MW, 2+1 CCGT block with W501Fgas turbines
Operation: 2004
Fuel: natural gas, oil
HRSG supplier: Alstom
T/G supplier: SWPC, GE
EPC: Lockwood Greene
Quick facts: In Jun 2005, Pinnacle West Capital
agreed to sell its 75% interest in the plant to Nevada Power Company for
$208mn. Southern Nevada Water Authority owns the remaining 25% of the
station. The plant has SCR with oxidation catalysts.
Photograph by C Bergesen
Posted 10 Dec 2005 |
Tracy CC
Location: NV
Operator: NV Energy
Configuration: 564-MW, 2+1 CCGT block with 7001FA+E gas turbines
Operation: 2008
Fuel: natural gas
HRSG supplier: Nooter
T/G supplier: GE
EPC: LG Constructors
Quick facts: The $467mn Frank A Tracy CCGT plant entered commercial
operation on 6 Jun 2008. It was the largest power project in northern
Nevada in almost 25yrs. SPX supplied the 30-cell air-cooled condenser.
During construction, more than 1.2mn manhours were expended without a
lost-time accident.
Photograph courtesy of Power
Posted 1 Oct 2008 |
|
|
 |
|
|
|
Walter Higgins
Location: NV
Operator: NV Energy
Configuration: 600-MW, 2+1 CCGT block with W501FD2 gas turbines
Operation: 2004
Fuel: natural gas
HRSG supplier: Alstom
T/G supplier: SWPC, Alstom
EPC: Sargent & Lundy, Graycor
Quick facts: Built and commissioned in Feb 2004 as Bighorn Generating
Station by Reliant Energy. The merchant plant was sold to NV Energy in Oct
2008 and renamed after retired President & CEO of Sierra Pacific Power Co. Kern River Gas Transmission Co
built a new pipeline to connect to this 200ac site in southern Clark
County. Higgins is a zero discharge facility and uses treated wastewater
from local casinos for cooling and make-up water. Hamon supplied the
air-cooled condenser.
Photograph by Jim Kennard and courtesy of Bighorn GS
Posted 10 Jan 2006 |
|
 |