Ceredo
Location: WV
Owner: Appalachian Power Co
Configuration: 6 X 83-MW 7001EA gas
turbines
Operation: 2001
Fuel: natural gas
T/G supplier: GE
EPC: American Electric Power
Quick facts: Ceredo was developed by Orion Power Holdings and acquired by
AEP, which assumed operational control on 15 Dec 2005.
Photograph courtesy of
Combined Cycle Journal
Posted 18 Apr 2008 |
|
Pleasants Energy
Location: WV
Owner: Tenaska Power Fund
Configuration: 2 X 172-MW 7001FA gas
turbines
Operation: 1971-2002
Fuel: natural gas
T/G supplier: GE
EPC: GE, Ragnar Benson
Quick facts: In Dec 2006, Tenaska Power Fund LP and an affiliate of
Warburg Pincus LLC jointly signed an agreement to acquire Pleasants Energy
and two other power stations from Dominion Energy. Plant is operated by
North American Energy Services.
Photograph courtesy of Combined Cycle Journal
Posted 8 Apr 2008 |