CCGT Plants in Venezuela
Argimiro Gabaldón
Location: Lara
Operator: CORPOELEC - Empresa Electrica Socialista
Configuration: 3 X 45-MW SGT-800 gas turbines
Fuel: natural gas, diesel oil
Operation: 2006-2008
T/G supplier: Siemens
EPC: Jantesa, Inserven CA
Quick facts: In Aug 2004, Enelbar awarded Siemens a contract for two 45-MW, SGT-800 gas turbines for this power station in Palavecino, Lara state. These were the first such machines supplied in South America. Construction started in August 2005 and the units went online in 2006. The photo shows Unit-3, added in 2008. Argimiro Gabaldón was a political activist born in Biscucuy, Portuguesa state in 1919. He was assassinated in 1964.

Photograph courtesy of CORPOELEC - Empresa Electrica Socialista
Posted 15 Apr 2012

Barinas Substation
Location: Barinas
Operator: PDVSA
Configuration: 2 X 50 MW FT4 TwinPac
Fuel: oil
Operation: 2013
T/G supplier: Pratt & Whitney
EPC: Derwick Associates

Photograph courtesy of Derwick Associates
Posted 7 Apr 2013

Cardon Genevapca
Location: Falcon
Operator: CORPOELEC - Empresa Electrica Socialista
Configuration: 3 X 105-MW W501D5A CHP
Fuel: natural gas, oil
Operation: 1994-1995
T/G supplier: WH, Brush
EPC: Raytheon
Quick facts: In 1995, EDC created Genevapca to develop and operate IPPs. Later in the year, after a bidding exercise with 14 other companies, Genevapca was authorized to develop Venezuela’s first IPP, this gas-turbine CHP plant supplying PDVSA’s Maraven refinery in Cardon and Lagoven refinery in Amuay and VASSA, a company making mineral oils and other hydrocarbon products.

Photograph courtesy of CA La Electricidad de Caracas
Posted 21 May 2008

Castillito
Location: Carabobo
Operator: CORPOELEC - Empresa Electrica Socialista
Configuration: 3 X 20-MW, 1 X 25-MW H-25
Fuel: natural gas
Operation: 1995-2006
T/G supplier: ABB, Hitachi
EPC: HPZ Venezuela, Mitsui
Quick facts: Shown is the fourth unit at Castillito. This machine was acquired through Mitsui & Co.

Photograph courtesy of HPZ Venezuela
Posted 21 May 2008

El Furrial
Location: Monagas
Operator: PDVSA
Configuration: 4 X 58 MW Trent 60
Fuel: natural gas
Operation: 2013
T/G supplier: Rolls-Royce
EPC: Derwick Associates, ProEnergy Services, Petro Suministros, Inversiones Vel-Rod

Photograph courtesy of Derwick Associates
Posted 7 Apr 2013

Guarenas
Location: Miranda
Operator: CORPOELEC - Empresa Electrica Socialista
Configuration: 2 X 30 MW LM2500, 2 X 48 MW LM6000
Fuel: natural gas, oil
Operation: 2012
T/G supplier: GE
EPC: Derwick Associates
Quick facts: GRR Guarenas can reach full load in 15min.

Photograph courtesy of CORPOELEC - Empresa Electrica Socialista
Posted 7 Apr 2013

Josefa Bastidas-II
Location: Vargas
Operator: CORPOELEC - Empresa Electrica Socialista
Configuration: 2 X 22-MW LM2500, 2 X 44-MW LM6000 gas turbines
Fuel: natural gas, oil
Operation: 2010-2011
T/G supplier: GE
EPC: Derwick Associates, Inserven
Quick facts: The Josefa Joaquina Sánchez Bastidas power station on Tacoa Bay was formerly known as Ricardo Zuloaga. The LM6000 machines were commissioned by Electricity Minister Alí Rodríguez Araque in May 2011. The total investment in the gas turbine plant was $130mn.

Photograph courtesy of CORPOELEC - Empresa Electrica Socialista
Posted 12 Feb 2012

Barcazas Josefa Rufina I & Margarita I
Location: Vargas
Operator: CORPOELEC - Empresa Electrica Socialista
Configuration: 2 X 170-MW 7001FA gas turbines
Fuel: diesel oil
Operation: 2011
T/G supplier: GE
EPC: Waller Marine, Signal International
Quick facts: These power barges are moored at the Josefa Bastida plant site on Tacoa Bay. Waller Marine built the $125mn power barges at the Signal International Shipyard in Orange TX. The barges measure 300ft X 100ft and sailed for Venezulea in Aug 2010. The GTs are dual-fuel capable.

Photograph courtesy of Ministerio del Poder Popular para Energía Eléctrica
Posted 12 Feb 2012

La Raisa-I
Location: Miranda
Operator: CORPOELEC - Empresa Electrica Socialista
Configuration: 3 X 60 MW FT8
Fuel: oil
Operation: 2010
T/G supplier: Pratt & Whitney
EPC: Derwick Associates

Photograph courtesy of Derwick Associates
Posted 7 Apr 2013

Las Morochas LM13
Location: Zulia
Operator: PDVSA
Configuration: 1 X 22 MW LM2500
Fuel: natural gas
Operation: 2010
T/G supplier: General Electric
EPC: Derwick Associates

Photograph courtesy of Derwick Associates
Posted 7 Apr 2013

Morichal
Location: Monagas
Operator: PDVSA
Configuration: 2 X 48 MW LM6000
Fuel: natural gas
Operation: 2012
T/G supplier: General Electric
EPC: Derwick Associates
Quick facts: This plant is associated with operations of Petrolera Sinovensa, a 60:40 JV of PDVSA with China National Petroleum Corp.

Photograph courtesy of Derwick Associates
Posted 7 Apr 2013

Oscar Machado
Location: Miranda
Operator: CORPOELEC - Empresa Electrica Socialista
Configuration: 5 X 90 MW W501D5A
Fuel: natural gas, oil
Operation: 1994-1995
T/G supplier: WH
Quick facts: The first GTs went in at the Oscar Machado site near Caracas in the early 1960s.

Photograph courtesy of CA La Electricidad de Caracas
Posted 22 Dec 2001

Barcazas San Lorenzo
Location: Zulia
Operator: CORPOELEC - Empresa Electrica Socialista
Configuration: 1 X 103.5-MW gas turbine
Fuel: diesel oil
Operation: 2010
T/G supplier: WH
Quick facts: In Feb 2010, PDVSA took possession of the Antonio Nicolas Briceno (San Lorenzo) power barge. This vessel is moored just offshore of Baralt municipality on Lake Maracaibo. The barge was purchased by PDVSA subsidiary Bariven and relocated from the Philippines. The new facility went online at the end of May 2010 and PDI Gerencia e Ingenieria SA was the electrical contractor for a 115kV connection from La Ceuta S/S to San Lorenzo S/S. The project cost 140mn bolivars.

Photograph courtesy of www.soberania.org
Posted 15 Apr 2012

SIDOR-A
Location: Bolivar
Operator: PDVSA
Configuration: 1 X 75 MW 7001EA, 2 X 53 MW LM6000 gas turbines
Fuel: natural gas
Operation: 2012
T/G supplier: General Electric
EPC: Derwick Associates
Quick facts: This plant is at Siderurgica de Orinoco CA.

Photograph courtesy of Derwick Associates
Posted 7 Apr 2013

Termobarrancas
Location: Barinas
Operator: Petroleos de Venezuela SA (PDVSA)
Configuration: 2 X 171-MW 7001FA gas turbines
Operation: 2007
Fuel: natural gas
T/G supplier: GE
EPC: Socoin, Inelectra, Schrader Camargo
Quick facts: This plant was the second developed by Repsol YPF to burn locally-produced natural gas. In Aug 2004, Repsol began negotiating a PPA with PDVSA and a 15yr agreement was signed in Mar 2005. Termobarrancas was designed for eventual conversion to combined-cycle operation. In Nov 2009, PDVSA took over Termobarrancas.

Photograph courtesy of Schrader Camargo Ingenieros Asociados
Posted 21 May 2008

Termozulia-I
Location: Zulia
Operator: CORPOELEC - Empresa Electrica Socialista
Configuration: 470-MW, 2+1 CCGT with 7001FA gas turbines
Fuel: diesel oil, natural gas
Operation: 2003-2006
HRSG supplier: NEM
T/G supplier: GE, Toshiba
EPC: Inelectra SACA, DSD de Venezuela SA, MAN Ferrostal
Quick facts: Termozulia is part of the General Rafael Urdaneta generation complex 50km south of Maracaibo in La Cañada de Urdaneta. The simple-cycle machines completed in Oct 2003 at a cost of $195mn. A further $205mn was expended to compete the combined-cycle conversion. The full CCGT project was inaugurated on 16 Jun 2007 by President Chavez.

Photograph courtesy of CORPOELEC - Empresa Electrica Socialista
Posted 12 Feb 2012

Termozulia-II
Location: Zulia
Operator: CORPOELEC - Empresa Electrica Socialista
Configuration: 450-MW, 2+1 CCGT with SGT6-5000F gas turbines
Fuel: diesel oil, natural gas
Operation: 2008-2011
HRSG supplier: Cerrey
T/G supplier: Siemens, Toshiba
EPC: MAN Ferrostaal, Jantesa
Quick facts: Termozulia-II cost about $550mn.

Photograph courtesy of www.soberania.org
Posted 4 Apr 2012

Termozulia-III
Location: Zulia
Operator: CORPOELEC - Empresa Electrica Socialista
Configuration: 500-MW, 2+1 CCGT with SGT6-5000F gas turbines
Fuel: diesel oil, natural gas
Operation: 2012-2013
HRSG supplier: Vogt
T/G supplier: Siemens
EPC: Electroingenieria, Sener Argentina,Inelectra SA
Quick facts: In Dec 2009, the EPC consortium was awarded the contract to build Termozulia-III. The project will cost $760mn and was scheduled for 39mos of construction. In June 2010, Corporacion Andina de Fomento (CAF) made a $165mn loan for the project.

Photograph courtesy of CORPOELEC - Empresa Electrica Socialista
Posted 4 Apr 2012

   
Termozulia-IV
Location: Zulia
Operator: CORPOELEC - Empresa Electrica Socialista
Configuration: 2 X 85-MW SGT6-5000F3 gas turbines
Fuel: diesel oil, natural gas
Operation: 2010
T/G supplier: Siemens
EPC: ProEnergy Services
Quick facts: In Nov 2009, ProEnergy was contracted for this project by Enelven. The construction was originally scheduled for 9mos. The $130mn project was inaugurated in September 2010.

Photograph courtesy of CORPOELEC - Empresa Electrica Socialista
Posted 12 Feb 2012