Geothermal Power Plants in Europe
![]() |
![]() |
![]() |
|
Bagnore-3 Photograph by Tohr (ImageShack) |
Larderello Photograph courtesy of ENEL SpA
|
Nuova Lagoni Rossi Photograph courtesy of ENEL SpA
|
![]() |
![]() |
![]() |
|
Pico Vermelho Location: Portugal Operator: Sociedade Geotérmica dos Açores SA Configuration: 1 X 3 MW ST, 10 MW ORC Operation: 1980-2007 T/G supplier: MHI, Melco, Ormat EPC: Ormat Quick facts: Pico Vermelho on San Miguel Island was the first geothermal power plant in the Azores. From 1980-2003, the 3-MW set ran over 130,000hrs and produced 80,9 GWh. In Mar 2007, Ormat completed a 10-MW binary geothermal extension at the site. This cost €35mn and took about 5yrs to build. Verkis and Hitaveita Suournesja were consultants on the project.
Photograph courtesy of Verkis |
Ribeira Grande Location: Portugal Operator: Sociedade Geotérmica dos Açores SA Configuration: 2 X 2.7 MW ORC Operation: 1994 T/G supplier: Ormat Quick facts: This was the second geothermal plant on San Miguel Island in the Azores.
Photograph courtesy of Ormat
|
Valle Secolo Photograph courtesy of ENEL SpA |
Data: industcards, Platts UDI World Electric Power Plants Data Base