At-Bashin
Location: Naryn
Operator: Electricheskiye Stantsii JSC
Configuration: 4 X 10 MW
Operation: 1970
T/G supplier: Ural, Privod
EPC: HPI
Quick facts: At-Bashin HPP is at 1,900m altitude. The project was approved for modernization in 2008 with Swiss assistance, but by 2013 the 65mn som overhaul project had still not started. Average production of this HPP is 130-160 GWh/yr.

Photograph xiruim (Panoramio)
Posted 29 Mar 2014

Kurpsai
Location: Osh
Operator: Electricheskiye Stantsii JSC
Configuration: 4 X 200 MW Francis
Operation: 1981-1982
T/G supplier: Kharkov, Elsib
EPC: HPI
Quick facts: This concrete gravity dam is on the Naryn River. It is 113m tall and 364m long. The HPP is conneccted to the grid at 110kV and 220kV. Average annual production is 263 GWh/yr.

Photograph courtesy of Kyrgyz Tariff Policy Project
Posted 13 Nov 2002

Shamaldysai
Location: Osh
Operator: Electricheskiye Stantsii JSC
Configuration: 3 X 80 MW Kaplan
Operation: 1975
T/G supplier: Tyazhmash, Elsib
Quick facts: Part of the Naryn River cascade. Average annual production is 900 GWh. Connected to the grid at 110kV and 220kV.

Photograph by obopol (fokti.yandex.ru)
Posted 30 Mar 2014

Tash-Kumyr
Location: Osh
Operator: Electricheskiye Stantsii JSC
Configuration: 3 X 150 MW Francis
Operation: 1985-1987
T/G supplier: Kharkov, Elsib
EPC: Naryngidroenergostroi
Quick facts: Part of the Naryn River cascade, located on the border of Leninsky district and Dzhanydzholskogo in Jalal-Abad region. Annual production is about 1,555 GWh.

Photograph by obopol (fokti.yandex.ru)
Posted 30 Mar 2014

Toktogul
Location: Osh
Operator: Electricheskiye Stantsii JSC
Configuration: 4 X 300 MW Francis
Operation: 1975
T/G supplier: LMZ, Elsib
Quick facts: This project on the Naryn River took 14yrs to build. The concrete gravity dam is 214m high and 293m long. Average annual production is 4,400 GWh.

Photograph by obopol (fokti.yandex.ru)
Re-posted 30 Mar 2014

Uch-Kurgansk
Location: Osh
Operator: Electricheskiye Stantsii JSC
Configuration: 4 X 45 MW Kaplan
Operation: 1961-1962
T/G supplier: LMZ, Electrosila
Quick facts: This was the first HPP on the Naryn River. Average annual production is 820 GWh.

Photograph courtesy of Kyrghyzosenergoholding
Posted 14 Feb 2003

Abbreviations

Data: industcards, Platts UDI World Electric Power Plants Data Base

Updated 05-Apr-2014