Chichester Dam
Location: NSW
Operator: Delta Electricity
Configuration: 1 X 120 kW impulse
Operation: 2001
T/G supplier: Pelena Energy
EPC: Jarara Energy
Quick facts: The dam is owned and operated by the Hunter Water Corp and
supplies water to the Newcastle region via Dungog Water Treatment Plant.
The dam was commissioned in 1923 and rehabilitated in 1985 . The minihydro
plant cost A$300,000.
Photograph courtesy of Delta Electricity
Posted 16 Mar 2005 |
Guthega
Location: NSW
Operator: Snowy Hydro Ltd
Configuration: 2 X 30 MW Francis
Operation: 1955
T/G supplier: English Electric
Photograph courtesy of Snowy Hydro Ltd
Posted 5 Jun 2004 |
Hume Dam
Location: NSW
Operator: Eraring Energy
Configuration: 2 X 26 MW Kaplan
Operation: 1957
T/G supplier: English Electric
Quick facts: This dam is just below the junctionof the Murray and Mitta
Mitta rivers 16km from Wodonga. Construction started in Nov 1`919
and the dam was completed in 1936. It is named after Hamilton Hume
who led an exploration party to the area in 1824.
Photograph courtesy of
Goulburn-Murray Water
Posted 20 Jan 2007 |
|
Murray-1
Location: NSW
Operator: Snowy Hydro Ltd
Configuration: 10 X 95 MW Francis
Operation: 1966-1967
T/G supplier: Boving, ASEA
Photograph courtesy of Snowy Hydro Ltd
Posted 5 Jun 2004 |
The Drop
Location: NSW
Operator: Pacific Hydro
Configuration: 1 X 2 MW Kaplan
Operation: 2002
T/G supplier: ESAC
EPC: MWH
Photograph courtesy of Pacific Hydro
Posted 5 Jun 2004 |
Tumut-3
Location: NSW
Operator: Snowy Hydro Ltd
Configuration: 6 X 250 MW Francis
Operation: 1972-1974
T/G supplier: Toshiba, Melco
Quick facts: Tumut-3 operates at 150.9m rated head. The plant was
overhauled in 2009/10. Units 4-6 have single-stage, 190-MW, under-coupled
pumps.
Photograph courtesy of Snowy Hydro Ltd
Posted 5 Jun 2004 |