Altenworth
Location: NOE
Operator: Verbund-Austrian Hydropower
Configuration: 9 X 39 MW Bulb
Operation: 1976
T/G supplier: Voith, Sulzer, Elin
Photograph courtesy of and copyright by Verbund
Posted 15 Jan 2004 |
Dorfmuhle
Location: NOE
Operator: evn naturkraft
Configuration: 2 X 1.25 MW Kaplan
Operation: 2003
T/G supplier: Kossler, Indar
Quick facts: This small hydro plan is at a historic site on the River Ybbs. During construction, special attention was paid to the
environmentally compatible design of it surroundings. Apart from various "eco-zones" in blind river branches, EVN also created a modern fish
ladder and a passage for the natural freight of the river. Two natural pools were developed for public recreational use along with Ybbs Nature Park.
Photograph courtesy of EVN AG
Posted 12 Nov 2006 |
Erlaufboden
Location: NOE
Operator: EVN AG
Configuration: 3 X 1.4 MW Francis
Operation: 1923
T/G supplier: BBC
Photograph courtesy of EVN AG
Posted 23 Oct 2004 |
|
Opponitz Rebuild
Location: NOE
Operator: Wien Energie
Configuration: 3 X 4.2 MW Francis
Operation: 1994
T/G supplier: Voith, Siemens
Quick facts: The River Ybbs winds 34km between the towns of Göstling and Opponitz on its way to the Danube and drops about 120m in the process.
In the 1920s, Städtischen Elektrizitätswerken Wien undertook the construction of this power station and a 110 kV overhead power line
connecting Opponitz, Gresten and Vienna. In 1994, the power station was overhauled and equipped with new technology. The distribution pipelines,
the turbines and the generators were renovated, leaving only the listed building in its original form.
Photograph by Herbert Ortner (wikipedia)
Posted 21 Feb 2011 |
Schutt
Location: NOE
Operator: EVN Naturkraft Erveugungs und Verteilungs GmbH
Configuration: 2 X 990 kW bulb
Operation: 2011
T/G supplier: Kossler
EPC: Retter & Partner Ziviltechnike, Gebruder Haider, EVN
Quick facts: This €9mn SHP project took 18mos to build.
Photograph courtesy of EVN AG
Posted 30 Sep 2012 |
Schwellod
Location: NOE
Operator: EVN AG
Configuration: 1 X 870 kW pit
Operation: 1995
T/G supplier: Voest
Photograph courtesy of EVN AG
Posted 8 May 2004 |
|
Wienerbruck
Location: NOE
Operator: EVN AG
Configuration: 2 X 990 kW, 1 X 2.1 MW Pelton, 1 X 4.8 MW Francis
Operation: 1908-1973
T/G supplier: Voith, BBC
Photograph courtesy of EVN
AG
Posted 23 Oct 2004 |
|
Ybbs-Persenberg
Location: NOE
Operator: Verbund-Austrian Hydropower
Configuration: 6 X 32 MW Bulb, 1 X 48 MW Kaplan
Operation: 1957-1995
T/G supplier: Voith, Sulzer, Ansaldo
Photograph courtesy of and copyright by Verbund
Posted 15 Jan 2004 |