Cachoeira da Lixa
Location: BA
Operator: Renova Energia SA
Configuration: 2 X 7.2 MW
Operation: 2008
T/G supplier: HISA
EPC: Intertechne Consultores Associados, Odebrecht, Sociedade de Engenharia e Montagens
Quick facts: The Serra da Prata project consist of three small hydro
plants on the Colino and Jucuruçu do Sul rivers. They were approved for
construction n in Oct 2006 and cost about $190mn in total.
Photograph courtesy of Renova Energia SA
Posted 15 Feb 2010 |
Colino-I
Location: BA
Operator: Renova Energia SA
Configuration: 2 X 5.5 MW
Operation: 2008
T/G supplier: HISA
EPC: Intertechne Consultores Associados, Odebrecht, Sociedade de Engenharia e Montagens
Quick facts: Part of the Serra da Prata project.
Photograph courtesy of Renova Energia SA
Posted 15 Feb 2010 |
Funil
Location: BA
Operator: Cia Hidroeletrica do Sao Francisco
Configuration: 3 X 10 MW Francis
Operation: 1962-1970
T/G supplier: Societe Forges Atteliers, Le Material Electric SW, Riva, Jeumont-Schneider
EPC: Servix
Quick facts: This plant is on the Rio Contas 122km downstream of the Pedra
plant.
Photograph courtesy of Cia Hidroeletrica do Sao Francisco
Posted 5 May 2007 |
|
Itapebi
Location: BA
Operator: Neoenergia SA
Configuration: 3 X 155 MW Francis
Operation: 2003
T/G supplier: Alstom
EPC: Intertechne Consultores Associados, Odebrecht
Quick facts: Itapebi on the Rio Jequitinhonha
was the largest plant completed in northeastern Brazil in 15yrs. The
180mn EPC contract was completed in 40mos, three months ahead of
schedule. Annual production is expected to be 1.7 TWh. ABN Amro was the lead arranger on a R$200mn project loan for this
facility.
Photograph courtesy of Neoenergia SA
Re-posted 5 Apr 2009 |
Pedra
Location: BA
Operator: Cia Hidroeletrica do Sao Francisco
Configuration: 1 X 20 MW Francis
Operation: 1978
T/G supplier: Neyrpic, Mecanica Pesada, BBC
EPC: Gallioli, Odebrecht
Quick facts: This multipurpose plant is on the Rio Contas near Jequie.
Photograph courtesy of Cia Hidroeletrica do Sao Francisco
Posted 6 May 2007 |
Sobradinho
Location: BA
Operator: Cia Hidroeletrica do Sao Francisco
Configuration: 6 X 175 MW Francis
Operation: 1979-1982
T/G supplier: LMZ, Electrosila
EPC: Hidroservice, Servix
Quick facts: The Sobradinho reservoir on the Rio Sao Franciso is about
320km long and covers 4,200 km², one of the largest reservoirs in the
world. The plant is connected to the 500kV grid.
Photograph courtesy of Cia Hidroeletrica do Sao Francisco
Posted 6 May 2007 |