Balbina
Location: AM
Operator: Eletronorte
Configuration: 5 X 50 MW Kaplan
Operation: 1989-1990
T/G supplier: Neyrpic, Mecanica de la Pena, GE
Photograph courtesy of Eletronorte
Posted 30 May 2002 |
Bonfante
Location: RJ
Operator: Brasil PCH SA
Configuration: 1 X 19 MW
Operation: 2008
T/G supplier: Alstom
EPC: Engevix, Seta Engenharia
Quick facts: The Bonfante project was authorized by Aneel in 2001 and is
located near Levy Gasparian on the Rio Paraibuna. The plant cost
R$90.9mn. Brasil PCH is a
special purpose company owned by Petrobras, Araguaia Centrais
Elétricas S.A., BSB Energética SA, Eletroriver SA and Jobelpa SA.
Photograph by Seta Engenharia
Posted 16 Aug 2009 |
Curemas
Location: PB
Operator: Cia Hidroeletrica do Sao Francisco
Configuration: 2 X 1.76 MW Francis
Operation: 1957-1959
T/G supplier: Voith, Westinghouse, Siemens
EPC: DNOCS
Quick facts: Curemas uses water stored two dams on the Rio Pianco and a
third on the Rio Aguiar linked by a canal. The powerhouse is below a
2,670m dam.
Photograph courtesy of Cia Hidroeletrica do Sao Francisco
Posted 6 May 2007 |
 |
 |
 |
|
Humaitá
Location: PE
Operator: Grupo Farias - Vale Verde
Configuration: 1 MW
Operation: 1925
T/G supplier: ??
Quick facts: This photo of a sugar factory small hydro was taken in
1940. The Pedroza mill is one of the oldest in the state still in full
operation.
Photograph by Hart Preston (Life archive on
Google)
Posted 7 Mar 2009 |
Luiz Gonzaga
Location: PI
Operator: Cia Hidroeletrica do Sao Francisco
Configuration: 6 X 247 MW Francis
Operation: 1988-1990
T/G supplier: Riva, Coemsa, Ansaldo, Voith, Siemens
EPC: Hidroservice, Mendes Junior
Quick facts: The dam and abutments measure 4,700m in length and reach
105m in height.
Photograph courtesy of Cia Hidroeletrica do Sao Francisco
Posted 6 May 2007 |
Mascarenhas
Location: ES
Operator: Espirito Santo Centrais Electricas SA (Escelsa)
Configuration: 3 X 43.7 MW Kaplan
Operation: 1974
T/G supplier: AC, GE
EPC: Leme Engenharia
Quick facts: Plant development was started by Cia Central
Brasileira de Força Elétrica (later Eletrobrás). When the new power station
went into operation at 123 MW, it fulfilled the state's
electricity requirement for a time. In 2000, the plant was upgraded to
its present capacity by GE Hydro Inepar, which is also building a 51-MW fourth unit. The plant is connected to the grid at 230kV.
Photograph courtesy of Energias do Brasil
Posted 12 Aug 2006 |
 |
 |
 |
|
Monte Serrat
Location: RJ
Operator: Brasil PCH SA
Configuration: 2 X 12.5 MW Kaplan
Operation: 2009
T/G supplier: Alstom
EPC: Engevix, Seta Engenharia
Quick facts: This plan is sited between the municipalities of
Simão Pereira, MG, and Comendador Levy Gasparian, RJ. BNDES financed
R$80.9mn for the project, or 74% of the total investment, R$109.7mn.
Photograph by Seta Engenharia
Posted 16 Aug 2009 |
Paraiso
Location: MS
Operator: Enersul
Configuration: 3 X 10.8 MW Francis
Operation: 2003
T/G supplier: Voith Siemens
Photograph courtesy of Voith Siemens Hydro
Posted 23 Sep 2003 |
Ponte Alta
Location: RS
Operator: Brookfield Energia Renovavel
Configuration: 2 X 6.71 MW Francis
Operation: 2007
T/G supplier: Hacker
Photograph courtesy of Hacker Industrial Ltda
Posted 30 Aug 2009 |
|
|
 |
|
|
|
Santa Fe
Location: RJ
Operator: Brasil PCH SA
Configuration: 2 X 15 MW
Operation: 2008
T/G supplier: Alstom
EPC: Koblitz
Quick facts: The Santa Fe project was authorized by Aneel in 2002 and is
located near Levy Gasparian on the Rio Paraibuna. The plant cost
r$141.3mn and went commercial on 9 May 2008.
Photograph by Sichan (Panoramio)
Posted 16 Aug 2009 |
|
 |