Hydroelectric Plants in China - Sichuan A to L

Anggun
Location: Sichuan
Operator: PowerChina Hydropower Development Group Co Ltd
Configuration: 4 X 190-MW, 1 X 12-MW Kaplan
Operation: 2014-2015
T/G supplier: Toshiba Hydro Power (Hangzhou) Co Ltd
EPC: Sinohydro No 7
Quick facts: Anggun is in Leshan City. It is the last stage of the the Dadu River cascade. These were China's largest Kaplan sets to date. Construction began on 29 Mar 2012. The first unit went commercial on 11 Dec 2014 and the second on 30 Dec, about 3mos ahead of schedule. Unit-3 followed on 30 Apr 2015 and Unit-4 on 28 Sep 2015. The investment was about 9.9bn yuan.

Photograph courtesy of PowerChina
Posted 20 Oct 2015

Dagangshan
Location: Sichuan
Operator: Guodian Dadu River Hydropower Development Co Ltd
Configuration: 4 X 650- MW Francis
Operation: 2015-2016
T/G supplier: Voith Siemens Hydro Shanghai, Dongfang
EPC: China Gezhouba Water & Power, Sinohydro No 7
Quick facts: This HPP is on the middle reaches of the Dadu River in Shimian County, Ya'an City. It was approved by the Sichuan development and reform commission in May 2004 and site prep began the following month. In Sep 2008, VSHS won a €75mn order for the turbines and the NDRC fully approved the project in Dec 2010. In Jun 2011, the first stage of excavation was completed and concrete pouring began in Sep 2011. The arch dam is 210m tall and 610m long. The first set commissioned on 2 Sep 2015. After completion, production is expected to be 11.45 TWh/ with delivery to the 500kV grid.

Photograph courtesy of Sinohydro No 7
Posted 22 Jan 2016

Dongxu
Location: Sichuan
Operator: Dongxu Hydropower Plant
Configuration: 4 X 2.5- MW
Operation: 2002
T/G supplier: ??
EPC: Sichuan Province Water Conservancy and Electric Power Engineering

Photograph courtesy of Sichuan Province Water Conservancy and Electric Power Engineering
Posted 27 Dec 2011

E'bian River
Location: Sichuan
Operator: E'bian River Hydro
Configuration: 2 X 23 MW Francis
Operation: ??
T/G supplier: Dongfang
EPC: Sinohydro No 4
Quick facts: This SHP is on the Guanliao River near Sihe Town.

Photograph courtesy of Sinohydro No 4
Posted 15 Feb 2014

Ertan
Location: Sichuan
Operator: Yalongjiang Hydropower Development Co Ltd
Configuration: 6 X 550 MW Francis
Operation: 1998-1999
T/G supplier: CGE
EPC: Harza, Impregilo, Philipp Holzmann
Quick facts: Ertan near Panzhihua on the Yalong River took 10yrs to build and was the largest hydropower plant in China at completion and for several years thereafter. The project has a 240m concrete arch dam, an underground powerhouse 280m long by 25.5m wide and 65m high, and a 1,167m diversion tunnel system. Construction began in 1991 and the project was completed at the end of 1999 at a cost of about $3.9bn. This was financed with one of the World Bank’s largest single project loans to that date. EHDC was established in 1991 and has three shareholders, State Development and Investment Corp (48%), Sichuan Provincial Investment Group Co Ltd (48%), and China Huadian Corp (4%). A Power Plant Trading Card was made for this plant.

Photograph courtesy of Ertan Hydropower Development Co
Re-posted 11 Apr 2012

Ganxipo
Location: Sichuan
Operator: China Datang Corp
Configuration: 3 X 15 MW Francis
Operation: 2012
T/G supplier: Fuyuan
Quick facts:This is the third cascade project completed on the Tianquan River in Tianquan County. It has a 110kV tieline to the 220kV Tinquan Substation. Funding and ownership issues delayed construction considerably. The plant finally went online in Sep 2012.

Photograph courtesy of Chna Datang Corp
Posted 3 Oct 2012

Guandi
Location: Sichuan
Operator: Ertan Hydropower Development Co
Configuration: 4 X 600 MW Francis
Operation: 2012-2013
T/G supplier: Dongfang
EPC: Hydrochina Chengdu Engineering Corp, Sinohydro No 7
Quick facts: In Jul 1998, China National Power Industry Corp approved a feasibility report on the construction of the Guandi hydroelectric plant on the Yalong River. The site is located where Xlchang City and Yanyuan County meet in Sichuan. The plant design originally called for a 168m RCC dam and a 694mn m³ reservoir and an 1,800-MW power plant. In Nov 2007, however, Ertan Hydroelectric Development ordered 600-MW sets from Dongfang and full construction began in Oct 2010. River impoundment began in Nov 2011 and the first unit was connected to the grid on 31 Mar 2012 with Unit-4 online in Apr 2013. The Rmb 12.49bn project is the first on the Yalong since Ertan was commissioned.

Photograph courtesy of Ertan Hydropower Development Co
Posted 11 Apr 2012

Hong Shiqiao
Location: Sichuan
Operator: Chengdu Overseas Industrial Co Ltd
Configuration: 2 X 11 MW Francis
Operation: 2000
T/G supplier: Dongfang
EPC: Sinohydro No 4
Quick facts: This SHP was registered in 2000, but the changing electricity market, grid electricity tariff adjustments and other issues, forced the opearting company into bankruptcy. In 2004. The plant was acquired at auction in 2005 by Chengdu Overseas Industrial Co Ltd. The site is 20km from downtown Pengzhou City, and is part of the Minjiang cascade. Annual electricity sales are about 100 GWh.

Photograph courtesy of Sinohydro No 4
Posted 15 Feb 2014

Houziyan
Location: Sichuan
Operator: Guodian Dadu River Hydropower Development Co Ltd
Configuration: 4 X 425-MW Francis
Operation: 2017
T/G supplier: Harbin
EPC: Hydrochina Chengdu Engineering Corp, China Gezhouba Group Corp/Sinohydro Bureau No 7
Quick facts: In May 2006, a feasibility report was completed for the Houziyan Dam and HPP on the Dadu River in Kangding County, Ganzi Tibetan AP. Full construction began in June 2011 and completion is expected in 2017. The project includes a 223.5m tall, concrete face, rockfill dam, and an underground powerhouse. This is the second talles dam of its kind. Anticipated annual output is 7,364 GWh. China Gezhouba Group did preliminary survey and design work and HydroChina Chengdu was later retained as lead engineer. In Nov 2011, Sinohydro Bureau No 7 was hired to be the lead construction contractor after NDRC gave final approval. The first unit commissioned on 1 Jan 2017.

Photograph courtesy of PowerChina
Posted 19 Mar 2017

Jiami-II
Location: Sichuan
Operator: Sichuan Power Development Co Ltd
Configuration: 3 X 12 MW Francis
Operation: 2012
T/G supplier: Xinan
EPC: Sinohydro
Quick facts: In Yanyuan County, Liangshan Yi AP.

Photograph courtesy of PowerChina
Posted 3 Jan 2015

Jiangbian
Location: Sichuan
Operator: CLP Hydro Power Ltd
Configuration: 3 X 110 MW Francis
Operation: 2011
T/G supplier: Toshiba Hangzhou
EPC: CLP, Sinohydro No 8
Quick facts: In Jun 2011, CLP completed the 330-MW Jiangbian hydoelectric plant in Jiulong County, Ganzi AP. This was CLP's largest hydro plant when built and the fifth hydro station in a cascade along the Jiulong River. Jiangbian has 8.7km of rock tunnels and an underground powerhouse.

Photograph courtesy of Sinohydro
Posted 26 Oct 2011

Jianyang Shiqiao
Location: Sichuan
Operator: Tuojian Hydroelectric Office
Configuration: 7.5 MW
Operation: ??
T/G supplier: ??
EPC: Sinohydro No 4

Photograph courtesy of Sinohydro No 4
Posted 15 Feb 2014

Jinping-I
Location: Sichuan
Operator: Yalongjiang Hydropower Development Co Ltd
Configuration: 6 X 600 MW Francis
Operation: 2013-2014
T/G supplier: Harbin
EPC: Northwest Hydro Consulting Engineers, Hydrochina Chengdu Engineering Corp, China Gezhouba Group Corp, China Railway 18th Bureau (Group) Co Ltd, East China Investigation and Design Institute
Quick facts: In Nov 2005, construction started on this HPP in Yanyuan and Muli counties, Liangshan Yi AP. Its reservoir on the lower Yalong reaches from Kala 358km downstream to the estuary of the main river. Planning for hydropower development on the Yalong's Jinping bend began in the 1960s. The site is unique with a 150km river length on the bend, but at times, the river courses are only separated by 16km. Between that distance, there is an elevation drop of 310m. Two projects were planned for the bend area by the former Sichuan and Shanghai design institutes along with the Ministry of Water Resources and Harza, namely Jinping-I and Jinping-II with a combined capacity of 8,400 MW. In Jul 1965, the Jinping Hydropower Engineering Headquarters was set up and design work continued. Jinping-I has a 305m-high, double-curvature concrete arch dam, one of the tallest in the world, plus spillway and dissipation systems, power tunnels, and an underground powerhouse. The T/G sets were ordered in Sep 2006. Total dynamic investment is Rmb 24.58bn and annual production will be about 17 TWh. Unit-6 commissioned on 24 Aug 2013 and Unit-5 followed on 6 Sep.

Photograph courtesy of www.cnstock.com
Posted 7 Sep 2013

Jiuzhaigou Qinglong
Location: Sichuan
Operator: Jiuzhaigou Electric Power Development Ltd
Configuration: 3 X 34 MW Francis
Operation: 2012
T/G supplier: ??
EPC: Hydrochina Chengdu Engineering
Quick facts: This HPP, also known as Baishuijiang Qinglong or Jiaocaiwan, is a run-of-river scheme on the Baishuijiang River, one of the branches of the Bailongjiang River in Jiuzhaigou county, A Ba Autonomous Prefecture. The project started construction on 3 Sep 2007 and was commissioned on 26 Apr 2012, several years past the original schedule.

Photograph courtesy of PowerChina
Posted 4 Jan 2015

Lalashan
Location: Sichuan
Operator: Huaneng Sichuan Hydropower Co Ltd
Configuration: 2 X 48 MW Francis
Operation: 2015
T/G supplier: Andritz
EPC: Sinohydro No 3
Quick facts: Andritz won the order for these T/G sets in Sep 2010. The ROR plant is in Batang County, Ganzi Tibetan AP. It is the third plant in the Bachu River. Lalashan was handed over in Oct 2015.

Photograph courtesy of Andritz
Posted 8 Jun 2016

Abbreviations

Data: industcards, Platts UDI World Electric Power Plants Data Base

Updated 19-Mar-2017