Baishan
Location: Jilin
Operator: Northeast China Electric Power
Configuration: 5 X 300 MW Francis
Operation: 1983-1992
T/G supplier: Harbin
EPC: China Northeastern Investigation Design & Research Co, Sinohydro
Quick facts: This is the largest hydroelectric plant in northeast China.
The 149.5m tall, 670m long concrete gravity arch dam is on the
Di'er Songhua Jiang. There are three sets in a
right-bank underground powerhouse and two more units were added later in a
surface powerhouse on the left bank. Work began in May 1975 and the sluice
gates were first closed in Nov 1982.
Photograph courtesy of China Northeastern Investigation Design & Research Co
Posted 12 Jul 2009 |
Fengman
Location: Jilin
Operator: Northeast China Electric Power
Configuration: 7 X 85 MW, 3 X 57 MW, 2 X 140 MW Francis
Operation: 1952-1998
T/G supplier: LMZ, Electrosila, Harbin
Quick facts: Fengman is on the Sounghua River 24km from Jilin City.
Construction on this multipurpose project was started by the Japanese in
1937 and the first power generation was in 1943, but the dam was not
completed until 1946. Under Chinese direction, the power station was built
out in three phases and Fengman was the largest hydro plant in Asia for a
time. The concrete gravity dam is 1,080m long and reaches a maximum height
of 90.5m. Fengman Reservoir (also called Songhua Lake) is 180km long and
reaches 75m in depth. A major dam reinforcement and overhaul program
started in 1987 and ended in 1997.
Photograph courtesy of China Northeastern Investigation Design & Research Co
Posted 12 Jul 2009 |
Dayuandu
Location: Hunan
Operator: Xiangjiang Navigation Multipurpose Project
Configuration: 4 X 31 MW bulb
Operation: 1999
T/G supplier: VA TECH
Quick facts: This hydroelectric plant on the Jiuliandeng River is
a component of the second-phase construction of the Xiangjiang Navigation
Multipurpose Project. The contract was awarded in 1996 and completion was in November 1999.
Photograph copyright by and courtesy of
VA TECH
Posted 22 Sep 2005 |
|

|

|
 |
|
Ertan
Location: Sichuan
Operator: Ertan Hydroelectric Development Co
Configuration: 6 X 550 MW Francis
Operation: 1998-1999
T/G supplier: CGE
EPC: Harza, Impregilo, Philipp Holzmann
Quick facts: Ertan near Panzhihua on the Yalong River took 10yrs to
build and was the largest hydropower plant in China at completion and for
several years thereafter. The project has a 240m concrete arch dam, an
underground powerhouse 280m long by 25.5m wide and 65m high, the largest
in Asia when built, and a 1,167m diversion tunnel system. Construction began in
1991 and the project was completed at the end of 1999 at a cost of about
$3.9bn. This was financed with one of the World Bank’s largest single
project loans. EHDC was established in 1991 and has three shareholders,
State Development and Investment Corp (48%), Sichuan Provincial
Investment Group Co Ltd (48%), and China Huadian Corp (4%).
Photograph courtesy of Ertan
Hydroelectric Development Co
Posted 10 Mar 2004 |
Jiangkou
Location: Chongqing
Operator: Jiangkou Development Co
Configuration: 3 X 100 MW
Operation: 2006
T/G supplier: ??
EPC: Northeast Investigation Design & Research Inst
Quick facts: Jiangkou in Wulong County has the highest, thin-arch dam in
China. Work on the 139m structure and power station began in Jul 1999.
This project was developed as a BOO project by local investors.
Photograph courtesy of China Northeastern Investigation Design & Research Co
Posted 12 Jul 2009 |
Lianhua
Location: Heilongjiang
Operator: Mudanjiang General Hydropower Plant
Configuration: 4 X 138.5 MW
Operation: 1996-1998
T/G supplier: Harbin
EPC: CHWEC, Sinohhdro Burean No 1
Quick facts: This project at Lianhua Township,
Linkou County, is the first large modern water conservancy project in
Heilongjiang. It cost 4.7bn yuan. Construction started in Nov 1992 and the
first unit went online in Dec 1996.
Photograph courtesy of China Northeastern Investigation Design & Research Co
Posted 15 Jul 2009 |
 |
 |
 |
|
Liujiaxia
Location: Gansu
Operator: Yellow River Upstream Hydro
Configuration: 4 X 225 MW, 1 X 300 MW Francis
Operation: 1969-1974
T/G supplier: Harbin
EPC: China National Water Resources & Hydropower Engineering
Photograph courtesy of Yellow River Conservancy Comm
Posted 26 Nov 2003 |
Nierji
Location: Heilongjiang
Operator: Nenjiang River Basin Electricity Co
Configuration: 4 X 62.5 MW Kaplan
Operation: 2006-2007
T/G supplier: Harbin
EPC: Northeast Investigation Design &
Research Inst, Sinohydro Bureau No 1
Quick facts: This is a large-scale multiuse project is on the Nenjiang in
the border area between Heilongjiang and Inner Mongolia. The project was
approved by the State Council in 1994, site prep began in Jun 2001,
and the first river closure was in Nov 2004. The total investment was
around 50bn yuan. The main asphalt, concrete-core dam runs 1.8km in length
and reaches 40.6m in height.
Photograph courtesy of
Beijing HTHX Civil Engineering Detecting & Evaluating Co
Posted 20 Jul 2009 |
Shilong (Songjiang-III)
Location: Jilin
Operator: Northeast Power Grid Co
Configuration: 2 X 35 MW Kaplan
Operation: 2009
T/G supplier: ??
EPC: Shenyang Northeast Electric Power Engineering
Consulting, Northeast Investigation Design &
Research Inst, Songjiang Power Engineering Construction Bureau
Quick facts: Shilong is part of the Shuang'gouu River cascade. The
concrete gravity dam is 43m high. Construction began in 2005 and river
closure was on 28 Nov 2007. Completion of the first unit is expected by
year-end 2009.
Photograph courtesy of China Northeastern Investigation Design & Research Co
Posted 20 Jul 2009 |
 |
 |
 |
|
Shuang'gou
Location: Jilin
Operator: Northeast Power Grid Co
Configuration: 2 X 140 MW
Operation: 2009?
T/G supplier: ??
EPC:
Shenyang Northeast Electric Power Engineering Consulting Co,
Northeast Investigation Design & Research Inst
Quick facts: Shuang'gou is upstream of Shilong and part of the Shuang'gouu River cascade. The
concrete face, rockfill dam reaches 110.5m. Road construction for the
project began in 1997. Diversion works began in 199 but were postponed
several times and restarted in Sep 2003. River
closure was on 30 Nov 2004.
Photograph courtesy of China Northeastern Investigation Design & Research Co
Posted 20 Jul 2009 |
Taipingwan
Location: Liaoning
Operator: GD Power Development Co Ltd
Configuration: 4 X 47.5 MW Kaplan
Operation: 1986-1987
T/G supplier: Harbin
EPC: Northeast Investigation Design & Research Inst, China Power Complete
Equipment Co Ltd
Quick facts: This project is on the lower Yalu and is a JV with North
Korea. Chinese companies built the plant and have entire operating
responsibilities. First design was in 1978, river closure was in Sep 1983,
first concrete was at the end of 1984, and the first unit commissioned on
25 Dec 1986. The concrete gravity dam is 1,185m long and 31.5m high.
Average output is about 720 GWh/yr.
Photograph courtesy of China Northeastern Investigation Design & Research Co
Posted 19 Jul 2009 |
Wanjiazhai
Location: Shanxi
Operator: Yellow River Wanjiazhai Project Development Corp
Configuration: 6 X 204 MW Francis
Operation: 1999-2000
T/G supplier: Tianjin, Harbin
EPC: Beifang Investigation Design & Research, Sinohydro Bureau 1
Quick facts: Wanjiazhai Water Control
Project comprises the first phase of basin development of the middle
reaches of the Yellow River. The left bank is part of Pianguan Co, Shanxi,
and the right bank is part of Zhunger Banner, Inner Mongolia. The State
Planning Commission approved the project in 1993, construction started in
1994, and river closure was completed in Dec 1995. Impoundment began on 1
Oct 1998 and the first unit went online on 28 Nov 1998, about a month
ahead of schedule. Along with water storage, the plant is expected to
supply about 2.75 TWh/yr for the North China grid. The concrete gravity
dam reaches 105m in height and has a crest length of 443m.The three
investment partners for the Rmb 6.058bn project are the Ministry of Water
Resources, and the provincial governments of Shanxi and Inner Mongolia.
Photograph courtesy of
Beifang Investigation Design & Research Co Ltd
Posted 1o Dec 2009 |
 |
|
 |
|
Yanguoxia
Location: Gansu
Operator: Yellow River Upstream Hydro
Configuration: 10 X 44 MW Francis
Operation: 1961-1998
T/G supplier: Harbin, Dongfang
EPC: China National Water Resources & Hydropower Engineering
Photograph courtesy of Yellow River Conservancy Comm
Posted 14 May 2005
|
|
Youshuishiti
Location: Chongqing
Operator: Chongqing Wujiang Industry Group Co Ltd
Configuration: 2 X 60 MW
Operation: 2007
T/G supplier: Sichuan Dongfeng Generator Co Ltd
EPC: HydroChina Zhongnan Engineering
Quick facts: This HPP is on the upper
reaches of the Youshui River in Youyang County. The project has a RCC gravity dam,
a spillway, stilling basins, a dam-type intake, and a dam toe powerhouse.
The dam reaches height of 63m in height and has a crest length of 187m.
Mean annual output is expected to be 392 GWh and the total cost of the
project was 900mn yuan. Construction started in Jul 2005.
Photograph courtesy of HydroChina Zhongnan Engineering
Posted 11 Jul 2009 |
 |