Hydroelectric Plants in El Salvador

5 de Noviembre
Location: Cabanas
Operator: Comision Ejecutiva Hidroelectrica del Rio Lempa
Configuration: 5 X 20 MW Francis
Operation: 1953-1966
T/G supplier: Bell, Hitachi, SEW, BBC, ASEA
EPC: Harza
Quick facts: This HPP is in Sensuntepeque 88km from the capital. The first studies on the Rio Lempa at La Chorrera del Guayabo were done in 1946/47 by Geroge A Fleming with the USBR. CEL was formed in Sep 1948 and signed an engineering contract with Harza for the 5 de Noviembre project. The concrete gravity dam is 65m tall and 800m long. It completed in Jun 1954. In Sep 2013, a $189mn expansion project got underway. This will add two 40-MW sets.

Photograph courtesy of cb24.tv
Posted 14 Jun 2015

15 de Septiembre
Location: San Vicente
Operator: Comision Ejecutiva Hidroelectrica del Rio Lempa
Configuration: 2 X 90 MW Francis
Operation: 1983-1984
T/G supplier: Voith, Mecanica Pena, Hitachi
EPC: Voith
Quick facts: 15 de Septiembre is in San Idelfonso. Unit-1 went online in Sep 1983 and Unit-2 in Mar 1984. Average productionis 605 GWh/yr. The concrete rockfill dam is 57m tall.

Photograph by Ll1324 (wikimedia)
Posted 14 Jun 2015

Cerron Grande
Location: Chalatenango
Operator: Comision Ejecutiva Hidroelectrica del Rio Lempa
Configuration: 2 X 86 MW Francis
Operation: 1976
T/G supplier: Allis Chalmers, BBC
EPC: Harza
Quick facts: Cerron Grande is located 78km from San Salvador in the central part of the country. The plant has a 9 m dam about 800 m long and cost about $100mn. The first unit went online in Feb 1976 and the second in Feb 1977. The units were extensively overhauled and uprated starting in 2002. Provision was made for two additional units and the third unit is in design.

Photograph courtesy of Inter-American Development Bank
Posted 28 Mar 2009

Abbreviations

Data: industcards, Platts UDI World Electric Power Plants Data Base

Updated 14-Jun-2015