Keila-Joa Rebuild
Location: Harjumaa
Operator: Eesti Energia SA
Configuration: 1 X 365 kW Kaplan
Operation: 2005
T/G supplier: Hydrolink
EPC: Facio Ehitus AS
Photograph courtesy of Facio Ehitus AS
Posted 3 Jan 2007 |
|
Linnamäe Rebuild
Location: Harjumaa
Operator: Eesti Energia SA
Configuration: 3 X 450 kW
Operation: 2002
T/G supplier: Waterpumps, AEG
EPC: FKSM
Quick facts: Linnamäe is 1.5km from the mouth of
the Jägala River. It was first commissioned in Apr 1924 and connected by a
33kV line to a paper and wood-pulp board factory in Tallinn. The Soviet
Army ruined the power plant in 1941.
Photograph courtesy of www.virumaa.ee
Posted 3 Jan 2007 |