Cadarese Rebuild
Location: VB
Operator: Enel SpA
Configuration: 2 X 35 MW Pelton
Operation: 2002
T/G supplier: ??
Quick facts: Cadarese is part of the River Toce
cascade and two 14-MW units went online in 1928. The plant was
enlarged and rebuilt in 2002.
Photograph courtesy of Enel SpA
Posted 5 Sep 2004 |
Chiomonte
Location: TO
Operator: Centralina Idroelettrica Orsiera-Chiomonte
Configuration: 1 X 40 kW Pelton
Operation: 2003
T/G supplier: IREM
EPC: IREM
Quick facts: This minihydro plant is fed by a 2,985m, 125mm diameter pipe dropping from 1,415m altitude to the powerhouse at 815m. The project cost
€95,000.
Photograph courtesy of
Provincia di Torino
Posted 22 Feb 2006 |
Gaggiotta
Location: NO
Operator: ERG Renew
Configuration: 2 X 241 kW S-Turbine
Operation: 1936
T/G supplier: Sulzer Escher Wyss
Qucik facts: ERG's hydro plants are along irrigation canals of
Associazione Irrigazione Est Sesia. This
plant is in Terdobbiate.
Photograph courtesy of ERG Renew
Posted 27 Jun 2010
|
|
Pont Ventoux Susa
Location: TO
Operator: Iren Energia SpA
Configuration: 2 X 75 MW Francis
Operation: 2005
T/G supplier: Riva, Ansaldo, Alstom
EPC: Astaldi, F.lli Baruzzi Srl, SEA Consulting
Quick facts: This plant uses the water from the Po tributary the Dora
Riparia and is near Oulx. An intake canal sends the water into a 14km
tunnel which carries it to the Val Clarea basin. From here, a 4km pressure
tunnel and 1.3km underground penstock run to an underground powerhouse.
One of the sets is equipped with a pump allowing recharge of the Val
Clarea storage tank.
Photograph courtesy of
F.lli Baruzzi Srl
Posted 16 Jan 2011 |
|
Verampio Rebuild
Location: VB
Operator: Enel
Configuration: 2 X 12.5 MW Pelton
Operation: 2008
T/G supplier: Andino, Indar
Quick facts: This plant
was built in 1910 in the town of Crodo and designed by architect Piero Portaluppi. It is
of considerable architectural interest.
Photograph courtesy of
www.mozzio.it
Posted 22 Nov 2008
|