Barcis
Location: PN
Operator: Edipower SpA
Configuration: 1 X 22 MW Kaplan
Operation: 1954
T/G supplier: Sulzer Escher Wyss
Quick facts: At completion, Barcis had the
highest-head Kaplan unit in Europe. The plant was refurbished in 1999.
Photograph courtesy of Enel SpA
Posted 5 Sep 2004 |
Castel Madama
Location: RM
Operator: ACEA SpA
Configuration: 9.4 MW
Operation: ??
T/G supplier: ??
Photograph courtesy of ACEA SpA
Posted 2 Feb 2008 |
Lauria
Location: PZ
Operator: Tozzi Renewable Energy SpA
Configuration: 3 X 1.5 MW Pelton
Operation: 2001
T/G supplier: Bouvier
Quick facts: This plant is in Calanchi, Lauria.
Photograph courtesy of Tozzi
Renewable Energy SpA
Posted 15 Feb 2010 |
|
Magisano
Location: CZ
Operator: A2A Produzione srl
Configuration: 1 X 46 MW Pelton
Operation: 1978
T/G supplier: Ansaldo, ABB
Quick facts: Part of A2A's Calabria power plants
group. Albi and Magisano are on the Passante River.
Photograph courtesy of A2A
Posted 3 Jul 2010 |
Orichella
Location: CS
Operator: A2A Produzione srl
Configuration: 2 X 75 MW Francis
Operation: 1980-1981
T/G supplier: Ansaldo, TIBB
Quick facts: Part of A2A's Calabria power plants
group. Silas, Orichella, Timpagrande and Calusa use waters from the Arvo and Ampollino rivers.
Photograph courtesy of A2A
Posted 3 Jul 2010 |
Palazzo-II
Location: CS
Operator: Enel SpA
Configuration: 1 X 46 MW Pelton
Operation: 1997
T/G supplier: Riva, ABB
EPC: Enelpower
Quick facts: Palazzo is on the River Battendiero.
Photograph courtesy of Enel SpA
Posted 5 Sep 2004 |
|
Pollino Nord
Location: PZ
Operator: Enel SpA
Configuration: 2 X 42.5 MW Pelton
Operation: 1973
T/G supplier: Sulzer Escher Wyss, Ansaldo
Quick facts: Pollino Nord uses water taken from a
reservoir on the River Sinni and flows through 1km of
penstock and pipe to a powerhouse on the River Noce. The
plant is used for peaking service.
Photograph courtesy of Enel SpA
Posted 30 Sep 2001 |
Sant'Angelo
Location: CH
Operator: ACEA SpA
Configuration: 1 X 58 MW Kaplan
Operation: 1958
T/G supplier: ??
Photograph courtesy of ACEA
SpA
Posted 2 Feb 2008
|
Satriano-II
Location: CZ
Operator: A2A Produzione srl
Configuration: 1 X 39 MW Francis
Operation: 1997
T/G supplier: Sulzer
EPC: Enel
Quick facts: Part of A2A's Calabria power plants group. Satriano I&II use water from the Anicale River.
Photograph courtesy of A2A
Posted 3 Jul 2010 |