Hydroelectric Power Plants in Lebanon

Boulous Arqash
Location: Bekaa
Operator: Electricite du Liban
Configuration: 3 X 36 MW Pelton
Operation: 1965-1976
T/G supplier: Neyrpic, Siemens
Quick facts: This HPP is in the Bisri River Basin. It draws water from the Abd El Al PS diverted into the 17km Awali tunnel, which crosses Jabal Niha-Jezzineand and terminates at Anan Lake. A steel penstock connects to the Arqash powerhouse. This is the most important HPP in the country in terms of production and water resource utilization, serving as the balancing facility for the three Litani power stations.

Photograph courtesy of Litani River Authority
Re-posted 30 May 2015

Charles Helou
Location: Mount Lebanon
Operator: Electricite du Liban
Configuration: 2 X 24 MW Francis
Operation: 1968
T/G supplier: Ansaldo, Siemens
Quick facts: This HPP use water from the Awali Pond, filled with tailwater from Awali PS plus water from the Bisri River. The 6.8km Joun tunnel runs to the Helou penstock.

Photograph courtesy of Litani River Authority
Posted 30 May 2015

Ibrahim Abd El Al
Location: Bekaa
Operator: Electricite du Liban
Configuration: 2 X 17 MW Francis
Operation: 1968
T/G supplier: Vevey
Quick facts: This HPP has an underground powerhouse at 660m elevation. Water is supplied from Qaraoun lake via the 6.4km Markaba tunnel along the right riverbank. The plant is named from a prominent Lebanese engineer who originat the Litani water resources scheme. In 1955, he was appointed Director General for Water and Electrical Affairs for the GOL.

Photograph courtesy of Litani River Authority
Posted 30 May 2015

Abbreviations

Data: industcards, Platts UDI World Electric Power Plants Data Base

Updated 30-May-2015