Perucica
Location: Montenegro
Operator: Elektroprivreda Crne Gore AD
Configuration: 5 X 38 MW, 2 X 58 MW Pelton
Operation: 1960-1978
T/G supplier: Litostrj, Koncar
Quick facts: The Perucica complex has three earth dams, 20km of canals,
a 3.3km, 4.8m diameter tunnel, and three penstocks. Annual production is
about 930 GWh and the plant is connected to the grid with 220- and 110kV
switchyards. Voith Hydro is rehabilitating the plant automation and controls systems.
Photograph courtesy of
Elektroprivreda Crne Gore AD
Posted 5 Apr 2009 |
|
Piva
Location: Montenegro
Operator: Elektroprivreda Crne Gore AD
Configuration: 3 X 114 MW Francis
Operation: 1976
T/G supplier: Litostrj, Koncar
EPC: Elektroproject, Hidrotehnika
Quick facts: The Piva Dam is one of the tallest in Europe at 220m. When
the dam was built, the 16th century Piva Monastery had to be relocated to higher ground 3.5km
away. The complete process took 12yrs, complicated by the need to
carefully disassemble and reassemble 1,260mē of frescoes painted
between 1604 and 1626.
Photograph courtesy of
Elektroprivreda Crne Gore AD