Dobrzyca Photograph
courtesy of Energetyka Poznanska Zaklad Elektrowni
Gorzupia I Photograph
courtesy of Zespól Elektrowni Wodnych Dychów SA
Gorzupia II Photograph
courtesy of Zespól Elektrowni Wodnych Dychów SA Jastrowie Photograph
courtesy of Elektrownie Wodne Sp zoo Koszyce Photograph
courtesy of Energetyka Poznanska Zaklad Elektrowni Podgaje Photograph
courtesy of Energetyka Poznanska Zaklad Elektrowni Ptusza Photograph
courtesy of Energetyka Poznanska Zaklad Elektrowni Abbreviations: T/G = turbine
generator Data: industcards, 
Hydroelectric Power Plants in Poland -
Wielkopolskie



Location: Wielkopolskie
Operator: Elektrownie Wodne Sp zoo
Configuration: 3 X 630 kW Kaplan
Operation: 1907
T/G supplier: Spirex
Quick facts: One of five plants on the River
Gwda, located at Km 34 with a 230m dam and a 92ha reservoir. Average
power production 6,370 MWh/yr.
Posted 11 Feb 2007
Location: Wielkopolskie
Operator: Zespól Elektrowni Wodnych Dychów SA
Configuration: 1 X 590 kW, 1 X 300 kW
Operation: 1935
T/G supplier: ??
Posted 29 Dec 2006
Location: Wielkopolskie
Operator: Zespól Elektrowni Wodnych Dychów SA
Configuration: 4 X 420 kW
Operation: 1998
T/G supplier: Flygt
Posted 29 Dec 2006



Location: Wielkopolskie
Operator: Elektrownie Wodne Sp zoo
Configuration: 2 X 700 kW MW Kaplan
Operation: 1930
T/G supplier: Spirex
Quick facts: At Km 26.5 on the River Gwda. Average
output is 5,500 MWh/yr.
Posted 8 Feb 2009
Location: Wielkopolskie
Operator: Elektrownie Wodne Sp zoo
Configuration: 1.44 MW Kaplan
Operation: 1937
T/G supplier: ??
Quick facts: At Km 26.5 on the River Gwda. Average
output is 5,500 MWh/yr.
Posted 11 Feb 2007
Location: Wielkopolskie
Operator: Elektrownie Wodne Sp zoo
Configuration: 2 X 1.2 MW Kaplan
Operation: 1929
T/G supplier: Voith, Spirex
Quick facts: A peaking plant at Km 73 on the River
Gwda. 520m diversion dam on the Gwda leads to a 6km channel to the
powerhouse.
Posted 11 Feb 2007

Location: Wielkopolskie
Operator: ENEA SA
Configuration: 2 X 600 kW Kaplan
Operation: 1932
T/G supplier: Voith, Spirex
Quick facts: At Km 54 on the River Gwda. A 300m dam
forms a 200ha reservoir.
Average output is 4,400 MWh/yr.
Posted 11 Feb 2007

Updated 02/08/09