Hydroelectric Plants in Portugal

Alto Lindoso
Location: Minho
Operator: EDP
Configuration: 2 X 315 MW Francis
Operation: 1992
T/G supplier: Sorefame

Photograph courtesy of EDP
Posted 5 May 2004

Bemposta
Location: Braganca
Operator: EDP
Configuration: 3 X 70 MW Francis
Operation: 1964-1965
T/G supplier: Voest, BBC

Photograph courtesy of EDP
Posted 5 May 2004

Bouca
Location: Leiria
Operator: EDP
Configuration: 3 X 25 MW
Operation: 1955-1956
T/G supplier: Siemens

Photograph courtesy of EDP
Posted 18 Aug 2004

Bragadas
Location: Vila Real
Operator: EHATB- Energia Hidroelectrica do Alto Tamega e Barros
Configuration: 2 X 5 MW Francis
Operation: 1999
T/G supplier: VA TECH
EPC: VA TECH
Quick facts: This water-to-wire project is in Santa Marinha, Ribeira de Pena.

Photograph courtesy of EHATB- Energia Hidroelectrica do Alto Tamega e Barros
Posted 28 Nov 2012

Cabril
Location: Castelo Branco
Operator: EDP
Configuration: 2 X 49 MW
Operation: 1954
T/G supplier: Alsthom

Photograph courtesy of EDP
Posted 18 Aug 2004

Caldeirão
Location: Alentejo
Operator: EDP
Configuration: 1 X 40 MW
Operation: 1994
T/G supplier: ??
Quick facts: This plant is in Trinta parish, Guarda municipality. A 200-kW minihydro plant was built nearby in 1927 and subsequently retired.

Photograph courtesy of EDP
Posted 18 Aug 2004

Canedo
Location: Braganca
Operator: RP Global Portugal Lda
Configuration: 1 X 10 MW Francis
Operation: 2008
T/G supplier: VA TECH
EPC: Aqualogus Engenharia e Ambiente Lda
Quick facts: The Candeo minihydro plant uses water is diverted from the Beca River, in the Douro River basin. The plant went online in Dec 2008 and has a 14.8m dam forming a 4ha reservoir, low pressure circuit, surge tank, penstock and the powerhouse with a single horizontal turbine. Canedo was named 2009 ‘Best Small Hydro Plant’ by the readers of International Water Power & Dam Construction.

Photograph courtesy of RP Global Portugal Lda
Posted 3 Oct 2009

Caniçada
Location: Braga
Operator: EDP
Configuration: 2 X 50 MW Francis
Operation: 1955
T/G supplier: Voith
Quick facts: The underground powerhouse at Caniçada is 134m below ground.

Photograph courtesy of EDP
Posted 5 May 2004

Carrapatelo
Location: Viseu
Operator: EDP
Configuration: 3 X 60 MW Kaplan
Operation: 1971-1972
T/G supplier: Kvaerner, BBC

Photograph courtesy of EDP
Posted 5 May 2004

Castelo do Bode
Location: Santarem
Operator: EDP
Configuration: 3 X 46 MW
Operation: 1951-1952
T/G supplier: Alsthom

Photograph courtesy of EDP
Posted 18 Aug 2004

Crestuma-Lever
Location: Porto
Operator: EDP
Configuration: 3 X 35 MW Bulb
Operation: 1985-1986
T/G supplier: Sorefame

Photograph courtesy of EDP
Posted 18 Aug 2004

Ermida
Location: Viseu
Operator: Hidrocentrais
Configuration: 7.6 MW Pelton
Operation: 1993
T/G supplier: Neyrpic, GEC-Alstom
EPC: Ed Ast & Co

Photograph courtesy of Hidrocentrais
Posted 11 May 2003

Lindoso
Location: Viana do Castelo
Operator: EDP
Configuration: 2 X 6 MW, 2 X 15 MW
Operation: 1922-1943
T/G supplier: Voith, SZEW, Siemens

Photograph courtesy of EDP
Posted 18 Aug 2004

Miranda Douro
Location: Vila Real
Operator: EDP
Configuration: 3 X 58 MW, 1 X 189 MW Francis
Operation: 1960-1995
T/G supplier: Voest, Neyrpic, Sorefame, Alsthom, Alstom

Photograph courtesy of EDP
Posted 18 Aug 2004

Pedrogao
Location: Alentejo
Operator: EDIA
Configuration: 2 X 5 MW
Operation: 2006
T/G supplier: Alstom
EPC: EDP, Mota-Engil
Quick facts: This 450m structure was the first RCC dam in Portugal. It is located 23km downstream of the main dam of the Alqueva complex.

Photograph courtesy of Comissão Nacional Portuguesa das Grandes Barragens
Posted 14 Feb 2007

Picote
Location: Braganca
Operator: EDP
Configuration: 3 X 60 MW
Operation: 1958
T/G supplier: Sorefame

Photograph courtesy of EDP
Posted 18 Aug 2004

Pocinho
Location: Guarda
Operator: EDP
Configuration: 3 X 64 MW Kaplan
Operation: 1983
T/G supplier: Kvaerner, ABB

Photograph courtesy of EDP
Posted 18 Aug 2004

Regua
Location: Vila Real
Operator: EDP
Configuration: 3 X 52 MW Kaplan
Operation: 1973-1974
T/G supplier: Kvaerner, BBC

Photograph courtesy of EDP
Posted 5 May 2004

Salamonde
Location: Braga
Operator: EDP
Configuration: 2 X 21 MW
Operation: 1953
T/G supplier: Voest

Photograph courtesy of EDP
Posted 8 May 2004

Touvedo
Location: Viana do Castelo
Operator: EDP
Configuration: 1 X 22 MW
Operation: 1993
T/G supplier: GEC-Alstom

Photograph courtesy of EDP
Posted 5 May 2004

Valeira
Location: Braganca
Operator: EDP
Configuration: 3 X 83.5 MW Kaplan
Operation: 1976-1977
T/G supplier: Kvaerner, BBC

Photograph courtesy of EDP
Posted 5 May 2004

Vales
Location: Vila Real
Operator: RWE Investerg
Configuration: 3.2 MW
Operation: 2008
T/G supplier: ??
Quick facts: This project is in Tresminas, Vila Pouca de Aguiar.

Photograph courtesy of EHATB- Energia Hidroelectrica do Alto Tamega e Barros
Posted 28 Nov 2012

Vila Vicosa
Location: Aveiro
Operator: Hidrocentrais
Configuration: 2 X 1.76 MW Francis
Operation: 1993
T/G supplier: Neyrpic, GEC-Alstom
EPC: Ed Ast & Co

Photograph courtesy of Hidrocentrais
Posted 11 May 2003

Vilarinho das Furnas
Location: Braga
Operator: EDP
Configuration: 1 X 74 MW Francis, 1 X 74 MW FPT
Operation: 1973-1988
T/G supplier: Voest, Soreframe, Alshom-Jeumont

Photograph courtesy of EDP
Posted 8 May 2004

Abbreviations

Data: industcards, Platts UDI World Electric Power Plants Data Base

Updated 28-Nov-2012