Belorechenskaya
Location: Krasnodar Krai - Southern
Operator: LUKOIL-Ekoenergo
Configuration: 3 X 16 MW Francis
Operation: 1954-1955
T/G supplier: Nohab, UETM
Quick facts: This HPP was put into operation in Sep 1954 and it remains th elargest hydopower plant in Krasnodar. Its original operating regime has been modified due to heavy siltation of two associated reservoirs. Unit-2 was rebuilt in 2007 with a new Tyazhmash turbine installed in place of the original Nohab machine.

Photograph courtesy of LUKOIL-Ekoenergo
Posted 29 Sep 2013

Cheboksarskaya
Location: Chuvash Republic - Volga
Operator: RusHydro
Configuration: 18 X 78 MW Kaplan
Operation: 1980-1985
T/G supplier: Tyazhmash, Electrosila
EPC: HPI Kuibyshev, Cheboksargesstroy
Quick facts: Development at the Cheboksarskaya site dates to 1931 when it was one of 10 proposed hydro plants on the Volga River (9 were built). In the 1950s, HPI worked on the original design and this was modified beginning in 1960. Originally, 32 bulb turbines were specified but this was changed to 18 vertical Kaplan units with several important design innovations. Construction began on 22 Jan 1967 and the first unit went commercial on 31 Dec 1980. Cheboksarskaya has 4.5km of associated structural waterworks including a 980m earthen dam reaching 42m height plus a a 548.5m powerhouse. For 30yrs, the plant has operated with reservoir elevation of around 63m as opposed to the design elevation of 68m. The required works were authorized in Apr 2010 and are expected to complete in 2012. In May 2008, HydroGK began electromechanical upgrades at Cheboksarskaya and to date two machines have been rebuilt. The PS is connected to the grid two 220kV circuits and three 500kV circuits.

Photograph courtesy of RusHydro
Posted 2 Feb 2011

Krasnopolyanskaya
Location: Krasnodar Krai - Southern
Operator: LUKOIL-Ekoenergo
Configuration: 1 X 7 MW, 2 X 7.3 MW Francis
Operation: 1949-1950
T/G supplier: Ural, UETM
Quick facts: This HPP is on the River Mzimta in Krasnaya Polyana village, Adler district, in Sochi.

Photograph courtesy of LUKOIL-Ekoenergo
Posted 29 Sep 2013

Maikopskaya
Location: Adygea Republic - Southern
Operator: LUKOIL-Ekoenergo
Configuration: 2 X 2 MW, 2 X 2.7 MW Kaplan
Operation: 1950
T/G supplier: Leffel, Ural, Elliott
Quick facts: This is the largest power station in Adygea. It went into operation in Dec 1950.

Photograph courtesy of LUKOIL-Ekoenergo
Posted 29 Sep 2013

Nizhnekamsk
Location: Tatarstan Republic - Volga
Operator: Tatenergo
Configuration: 16 X 75 MW Kaplan
Operation: 1979-1987
T/G supplier: LMZ, Elsib

Photograph courtesy of Tatenergo
Posted 10 Sep 2006

Pavlovsk
Location: Bashkortostan Republic - Volga
Operator: OOO Bashkir Generation Co
Configuration: 4 X 42.5 MW Kaplan
Operation: 1959-1961
T/G supplier: Kharkov, Electrosila
EPC: HPI
Quick facts: Construction on this HPP on the Ufa River began in 1950. The site is in Nurimanovsky district.

Photograph courtesy of OOO Bashkir Generation Co
Posted 24 May 2015

Tsimlyanskaya
Location: Rostov Oblast - Southern
Operator: LUKOIL-Ekoenergo
Configuration: 1 X 50 MW, 3 X 52.5, 1 X 4 MW Kaplan
Operation: 1952-1954
T/G supplier: LMZ, Andritz, Electrosila, Elsib
EPC: HPI
Quick facts: The first unit at this HPP was commissioned in Jun 1952. The dam is the final step on the Volga-Don Canal. Units 2&3 were modernized in 1999/2001. Unit-4 was completely rebuilt with a a new Andritz turbine and Elsib generator. The rebuild commissioned in Jan 2012. Plant production averaged 525 GWh from 2010-2012.

Photograph courtesy of LUKOIL-Ekoenergo
Posted 28 Sep 2013

Yumaguzinsk
Location: Bashkortostan Republic - Volga
Operator: OOO Bashkir Generation Co
Configuration: 3 X 15 MW Kaplan
Operation: 2007
T/G supplier: Tyazhmash, UETM
EPC: HPI, Gidroenergoprom
Quick facts: Construction on this HPP on the Belaya River began in 1998. The location is in Kugarchinskii district.

Photograph courtesy of OOO Bashkir Generation Co
Posted 24 May 2015

Zhigulevskaya
Location: Samara - Volga
Operator: RusHydro
Configuration: 16 X 115 MW, 4 X 125.5 MW Kaplan
Operation: 1955
T/G supplier: LMZ, UETM
EPC: HPI
Quick facts: Construction on this HPP began in 1950 and ended in 1957. The main building is 700m long. Output is evacuated by four 500kV lines. The plant machinery is being renovated by PMG and each machine will be uprated to 125.5 MW by 2016. Formerly known as Volzhskaya Lenin.

Photograph courtesy of RusHydro
Posted 13 Feb 2014