Conventional Hydroelectric Plants in Spain - Castilla y Leon

Aldeadavila
Location: Salamanca
Operator: Iberdrola
Configuration: 6 X 119 MW Francis,
2 X 211 MW reversible
Operation: 1962-1986
T/G supplier: Neyrpic, KMW, GE

Photograph courtesy of Iberdrola
Posted 28 Apr 2002

Castro
Location: Zamora
Operator: Iberdrola
Configuration: 2 X 40 MW Francis,
1 X 110 MW Francis
Operation: 1952-1977
T/G supplier: Boving, Nohab, GE

Photograph courtesy of Iberdrola
Posted 27 Feb 2005

Gavilanes
Location: Avila
Operator: Iberdrola
Configuration: 2 X 600 kW Pelton
Operation: 1939
T/G supplier: ??

Photograph courtesy of Iberdrola
Posted 27 Feb 2005

Los Batanes Rebuild
Location: Segovia
Operator: Enel Unión Fenosa Renovables SA
Configuration: 22 kW Kaplan
Operation: 1993
T/G supplier: ??
Quick facts: Two 80-kW sets were installed at this site in 1929.

Photograph courtesy of Enel Unión Fenosa Renovables SA
Posted 20 Jul 2008

Villarino
Location: Salamanca
Operator: Iberdrola
Configuration: 6 X 135 MW Francis
Operation: 1970-1977
T/G supplier: KMW, BBC

Photograph courtesy of Iberdrola
Posted 13 Aug 2002

Abbreviations:  BBC = Brown Boveri & Cie, GE = General Electric, KMW = Boving-KMW Turbin

Data: industcards, Platts UDI World Electric Power Plants Data Base

Updated 08/21/08