Butschwil Dietfurt
Location: St Gallen
Operator: Hydroelectra SA
Configuration: 1 X 95 kW Kaplan
Operation: 2002
T/G supplier: VA TECH
Photograph courtesy of Hydroelectra SA
Posted 28 Dec 2007 |
Butschwil Soor
Location: St Gallen
Operator: Hydroelectra SA
Configuration: 1 X 95 kW Kaplan
Operation: 2002
T/G supplier: VA TECH
Photograph courtesy of Hydroelectra SA
Posted 28 Dec 2007 |
Eglisau
Location: Zurich
Operator: NOK Nordostschweizerische Kraftwerke AG
Configuration: 7 X 4.6 MW Francis
Operation: 1915-1921
T/G supplier: ??
Quick facts: In Feb 2007, Voith Siemens Hydro
was a awarded a contract to deliver new electromechanical equipment as
part of the rehabilitation of the Eglisau power station. The project is to
be completed by 2012, by which time Voith Siemens will deliver 7 X 6.7-MW Kaplan turbines, generators and governors
and the complete
control package. The power station is an architectural landmark with much
of the facility in its original condition. In 85yrs of operation, Eglisau produced
over 20 TWh of electricity.
Using Kaplan turbines instead of the old Francis units increases the
flow rate from 385 m³/s to 500 m³/s and is expected to increase annual
plant output by about a third from 246 to 315 GWh.
Photograph courtesy of Axpo
Posted 16 May 2007 |
|
Mels Halde
Location: St Gallen
Operator: Hydroelectra SA
Configuration: 1 X 35 kW, 1 X 22 kW Spiral
Operation: 2001
T/G supplier: ??
Photograph courtesy of Hydroelectra SA
Posted 28 Dec 2007 |
Schaffhausen
Location: Schaffhausen
Operator: Kraftwerk Schaffhausen AG
Configuration: 2 X 12.7 MW Francis
Operation: 1963
T/G supplier: Sulzer, BBC
Quick facts: Water power facilities were first installed at this site in
the 1831. The current power station was modernized in 2004.
Photograph courtesy of Kraftwerk Schaffhausen AG
Posted 4 Jul 2005 |
Trempel Rebuild
Location: St Gallen
Operator: Kraftwerk Trempel AG
Configuration: 2 X 900 kW Spiral
Operation: 2007
T/G supplier: Hitzinger
EPC: Hydro-Solar AG, Bleiker + Partner AG, Ingenieurbüro A Frigg
Quick facts: This site was first used for hydropower in 1924, rebuilt in
1993, and rebuilt again in 2007. About 8 GWh/yr is supplied to St Gallisch
Appenzeller Kraftwerke AG.
Photograph courtesy of Kraftwerk Trempel AG
Posted 23 Dec 2008 |