Arniberg Rebuild
Location: Uri
Operator: Elektrizitätswerk Altdorf AG
Configuration: 2 X 6.5 MW
Operation: 1969
T/G supplier: ??
Quick facts: This plant went online in 1910. The plant is at about 1,370m
altitude. Plant refurbishment was undertaken by Electrowatt.
Photograph courtesy of Elektrizitätswerk Altdorf AG
Posted 14 Dec 2008 |
Bürglen
Location: Uri
Operator: Elektrizitätswerk Altdorf AG
Configuration: 2 X 10.35 MW Pelton
Operation: 1967
T/G supplier: Sulzer, BBC
Quick facts: This was the original power plant of EWA with the first
machines in operation in 1895.
Photograph courtesy of Elektrizitätswerk Altdorf AG
Posted 14 Dec 2008 |
Dorfbach
Location: Uri
Operator: Elektrizitätswerk Altdorf AG
Configuration: 1 X 55 kW
Operation: 2006
T/G supplier: ??
Photograph courtesy of Elektrizitätswerk Altdorf AG
Posted 17 Dec 2008 |
|
Farb
Location: Uri
Operator: Elektrizitätswerk Altdorf AG
Configuration: 1 X 80 kW Pelton
Operation: 1983
T/G supplier: ??
Photograph courtesy of Elektrizitätswerk Altdorf AG
Posted 23 Dec 2008 |
Gurtnellen
Location: Uri
Operator: Elektrizitätswerk Altdorf AG
Configuration: 6 MW Pelton
Operation: 1942
T/G supplier: ??
Photograph courtesy of Elektrizitätswerk Altdorf AG
Posted 23 Dec 2008 |
Isenthal
Location: Uri
Operator: Elektrizitätswerk Altdorf AG
Configuration: 1 X 11 MW Pelton
Operation: 1956
T/G supplier: Sulzer Escher Wyss
Quick facts: Isenthal was refurbished in 2008 at a cost of SF 2.3mn. The
plant controls, MV switchgear, and transformer were replaced and the
pressure tunnels inspected and repaired. Among other things, this project
increased plant output by about 5%.
Photograph courtesy of Elektrizitätswerk Altdorf AG
Posted 23 Dec 2008 |
|
Kleintal
Location: Uri
Operator: Elektrizitätswerk Altdorf AG
Configuration: 1 X 1.15 MW
Operation: 1959
T/G supplier: ??
Quick facts: Kleintal is fed by waters from Chlitalbach stream dammed
above Isenthal village. In 2006, EWA contacted with ABB for a new
removable stator, voltage regulator and synchronization system. ABB also
dismantled the generator and removed it to Birr for reconditioning. The
equipment was restarted in Mar 2008 with power output up about 10%.
Photograph courtesy of Elektrizitätswerk Altdorf AG
Posted 26 Dec 2008 |
Schächental
Location: Uri
Operator: Elektrizitätswerk Altdorf AG
Configuration: 1 X 2.2 MW Pelton
Operation: 1962
T/G supplier: ??
Quick facts: This plant was refurbished by Energiesysteme und Anlagentechnik AG.
Photograph courtesy of Elektrizitätswerk Altdorf AG
Posted 26 Dec 2008 |
Stäubenwald Rebuild
Location: Uri
Operator: Elektrizitätswerk Altdorf AG
Configuration: 1 X 285 kW
Operation: 2007
T/G supplier: ??
Photograph courtesy of Elektrizitätswerk Altdorf AG
Posted 26 Dec 2008 |