Hydroelectric Power Plants in Turkey - Anadolu

Ataturk
Location: Sanliurfa
Operator: EUAS
Configuration: 8 X 300 MW Francis
Operation: 1992-1993
T/G supplier: SZEW, ABB
EPC: Dolsar, ATA Insaat
Quick facts:
Ataturk Dam is the largest in a series of 22 dams and 19 hydroelectric plants built on the Euphrates and Tigris rivers as part of the GAP, a massive irrigation and hydroelectricity scheme. The dam is one of the world's largest earth-and-rock fill dams measuring 184m high and 1,820m long

Photograph courtesy of Palet Insaat
Re-posted 1 Dec 2010

 

Birecik
Location:Sanliurfa
Operator: EUAS
Configuration: 6 X 112 MW Francis
Operation: 1994
T/G supplier: Neyrpic, ACEC, Sulzer
EPC: Philip Holzman, TemelsuGama, Strabag Osterreich
Quick facts:This was the first large Turkish hydroelectric BOT project and it reached financial close in Nov 1995 about 7yrs from the time the development process started. Lead arrangers were Bayerische Landesbank, Chase Manhattan, Generale Bank, Girocredit Bank, KfW and Societe Generale. Construction on $1.64bn plant began in Mar 1996 and the government provided a sovereign guarantee to cover payment obligations as well as other indirect guarantees. Ownership of Birecik is to be transferred to the state in 2016. It has a 62.5m high, 2.5km long dam 30km upstream from the Syrian frontier. Verbundplan operates the plant. The project was complicated by the need for water usage agreements with both Iraq and Syria and the discovery of the ruins of Zuegma, an ancient Roman outpost, near the plant site late in construction.

Photograph courtesy of Philip Holzman AG
Posted 7 Mar 2001

Dicle
Location: Diyarbakir
Operator: EUAS
Configuration: 2 X 55 MW
Operation: 1991-2001
T/G supplier: Resita, Temsan
EPC: Romenergo, Kiska
Quick facts: The 87m multipurpose Dicle Dam is 50km north of Diyarbakir city where the Maden and Dibni rivers join and become the Tigris River. The reservoir has an area of 24 km² and is part of the GAP project.

Photograph courtesy of Türkiye Müteahhitler Birligi
Posted 9 Dec 2006

Karakaya
Location: Diyarbakir
Operator: EUAS
Configuration: 6 X 300 MW Francis
Operation: 1987-1989
T/G supplier: Sulzer Escher Wyss, ABB
EPC: Electrowatt

Photograph copyright by and courtesy of VA TECH
Posted 16 Feb 2002

Keban
Location: Elazig

Operator: EUAS
Configuration: 4 X 157.5 MW, 4 X 175 MW Francis
Operation: 1974-1982
T/G supplier: Voest, Neyrpic, AEG
EPC: Ebasco , Sogea
Quick facts: The Keban Dam was the first of the large dams to be built on the Euphrates River. It created a reservoir extending 50km upriver and 100km upriver in the Murat River valley to the east. The Murat joined the Euphrates about 7km north of the dam.

Photograph by Onur Onur (TrekEarth)
Posted 25 Feb 2007

Ozluce
Location: Elazig
Operator: EUAS
Configuration: 2 X 100 MW Francis
Operation: 1998-1999
T/G supplier: Kvaerner, AEG
EPC: Temelsu, Ozlatin
Quick facts: President Suleyman Demirel opened the project in Dec 1999 after 14yrs of construction. The facility has a 144m rockfill dam and cost  273tn lira.

Photograph courtesy of Türkiye Müteahhitler Birligi
Posted 10 Dec 2006

Pinar
Location: Elazig
Operator: AGE Insaat ve Ticaret AS
Configuration: 3 X 10 MW Francis
Operation: 2009
T/G supplier: Hangzhou Yatai
EPC: Age Insaat, Dogru Muhendislik, Eltes Enerji Mühendislik
Quick facts: This project is in Tut District on the Goksu River.

Photograph courtesy of AGE Insaat ve Ticaret AS
Posted 11 Apr 2011

Seyrantepe
Location: Elazig
Operator: Bilgin Enerji
Configuration: 2 X 25.7 MW Francis
Operation: 2008
T/G supplier: Alstom
EPC: Su-Yapi, Limak
Quick facts: The Seyrantepe project is on the Peri River and is a partnership between Bilgin Elektrik and Limak Group. The 31m dam sand-gravel fill dam has a clay core and the two units are expected to produce 161 GWh/yr. A subsidiary of Limak Holding has a 49yr generation license for the plant.

Photograph courtesy of Limak Enerji
Posted 20 Sep 2008

Sureyyabey
Location: Yozgat
Operator: DSI
Configuration: 3 X 4.8 MW
Operation: 2008
T/G supplier: ??
EPC: Ecetur Sirketler Grubu, Kiska
Quick facts:This clay-core, rockfill dam is 102.6m high and 636m long. A 1.9km tunnel connects to the powerhouse. Construction started in 1998. This multipurpose project is expected to supply 50 GWh/yr.

Photograph courtesy of Türkiye Müteahhitler Birligi
Posted 26 Dec 2006
  

Uzunçayır
Location: Tunceli
Operator: Limak Enerji
Configuration: 3 X 32 MW Francis
Operation: 2010
T/G supplier: Voith, Siemens
EPC: Su-Yapi, Ozgur
Quick facts: Uzunçayir is on Munzur Creek in Eastern Anatolia. The 58m sand-gravel fill dam has a clay core and a fill volume of 1.47m³. Annual output is expected to be 317 GWh. Limak has a 49yr operation license for the plant.

Photograph courtesy of Limak Enerji
Posted 20 Sep 2008

Yamula
Location: Kayseri
Operator: Ayen Enerji
Configuration: 2 X 50 MW Francis
Operation: 2005
T/G supplier: GE, Vaptsarov
EPC: UMB, Lahmeyer, Pustiler-Sargin
Quick facts: In May 2003, GE received a $17.9mn contract to supply turbines, generators, and additional equipment and services for the Yamula project. ABB won a €1.3mn order for the control system and electrical equipment.

Photograph courtesy of Türkiye Müteahhitler Birligi
Posted 26 Dec 2006

Yedisu
Location: Bingol
Operator: Ozaltin Enerji
Configuration: 3 X 7.7 MW S-turbine
Operation: 2010
T/G supplier: ANdriyz
EPC: Ozaltin, Nurol
Quick facts: Construction on this project began in Q1, 2008. The clay core dam is on the Firat (Euphrates) River.

Photograph courtesy of Ozaltin
Posted 20 Mar 2011

Abbreviations

Data: industcards, Platts UDI World Electric Power Plants Data Base