Hydroelectric Plants in Turkey - Bati Karadeniz, Zonguldak AB

Başak
Location: Bartin
Operator: Nisan Elektromekanik Enerji
Configuration: 2 X 2.8 MW, 1 X 1.25 MW Francis
Operation: 2010
T/G supplier: Zhejiang Orient Engineering
EPC: Atac
Quick facts: Construction started at Başak in Jan 2008 and the plant went online in Apr 2010.

Photograph courtesy of Nisan Elektromekanik Enerji
Posted 24 Nov 2012

Tefen
Location: Zonguldak
Operator: Aksu Enerji ve Ticaret AS
Configuration: 3 X 11 MW Francis
Operation: 2011
T/G supplier: Tianfa
EPC: Aksu, Enerden
Quick facts: This project started construction in Oct 2007 and completed in May 2011.

Photograph courtesy of Tianjin Tianfa Heavy Hydropower
Posted 29 Dec 2014

Umut-III
Location: Bartin
Operator: Nisan Elektromekanik Enerji
Configuration: 3 X 4-MW Francis
Operation: 2011
T/G supplier: Zhejiang Orient Engineering
EPC: Atac
Quick facts: Construction started at Başak in Nov 2008 and the plant went online in Dec 2011.

Photograph courtesy of Nisan Elektromekanik Enerji
Posted 24 Nov 2012

 
Yavuz
Location: Amasya
Operator: Masat Enerji Elektrik Üretim
Configuration: 3 x 7.8 MW Kaplan
Operation: 2010
T/G supplier: Liyuan
EPC: Tasyapi Insaat, TCT
Quick facts: The Yavuz plant is on the Yesilirmak River in Taşova and went online in Sep 2010. The project was one of several originally developed by Cogentrix Energy and funding for the project was obtained from Yapi Kredi Bankasi AS.

Photograph by asdoper (Panoramio)
Posted 27 Jun 2012

Yaprak-II
Location: Bartin
Operator: Nisan Elektromekanik Enerji
Configuration: 2 X 5.4-MW Francis
Operation: 2011
T/G supplier: Zhejiang Jinlun Electromechanic
EPC: Atac
Quick facts: Construction started at Başak in Mar 2009 and the plant went online in Apr 2011.

Photograph courtesy of Nisan Elektromekanik Enerji
Posted 24 Nov 2012

Abbreviations

Data: industcards, Platts UDI World Electric Power Plants Data Base

Updated 15-Feb-2015

Home