Hydroelectric Plants in Turkey - Kuzeydogu
Bagistas-I
Location: Erzincan
Operator: Ictas Enerji Uretim ve Ticaret AS
Configuration: 3 X 44.7 MW, 1 X 6.3 MW Francis
Operation: 2014
T/G supplier: Dongfang
EPC: HDM, Eltes Enerji Mühendislik
Work on this HPP began in Jan 2011, the T/G contract was signed in Jul 2011, and the project completed in May 2014.The dam is 50m tall.

Photograph courtesy of Ictas Enerji
Posted 22 Feb 2015

Çalkışla
Location: Erzincan
Operator: IC-EN Elektrik Uretim ve Tic AS
Configuration: 1 X 5.94 MW, 1 X 1.88 MW spiral
Operation: 2008
T/G supplier: Kossler
EPC: Ismail Celik

Photograph courtesy of Ismail Çelik
Posted 24 Dec 2010

Koroglu
Location: Ardahan
Operator: EBD Enerji Uretim ve Ticaret AS
Configuration: 3 X 26.7-MW Francis
Operation: 2018
T/G supplier: ??
EPC: ARQ Consulting Engineers, Soyal
Quick facts: This project is on the Kura River and will be the largest HPP in the province when completed. Work began in May 2011.

Photograph courtesy of Unal Grup
Posted 16 Jan 2017

Kontanli
Location: Ardahan
Operator: EBD Enerji Uretim ve Ticaret AS
Configuration: 2 X 25-MW Francis
Operation: 2016
T/G supplier: ??
EPC: ARQ Consulting Engineers, Ivasen
Quick facts: This was one of four regional HPP opened in Jan 2016. It is part of the Koroglu dam complex and connects to the 154kV grid..

Photograph courtesy of Unal Grup
Posted 16 Jan 2017

Narinkale
Location: Kars
Operator: EBD Enerji Uretim ve Ticaret AS
Configuration: 4 X 8-MW Francis
Operation: 2009
T/G supplier: Zhejiang Orient
EPC: Enerden Enerji, Berdemir
Quick facts: Work started on this HPP in 2007. It has a 7km headrace canal from the Karas River.

Photograph courtesy of Unal Grup
Posted 16 Jan 2017

Serap
Location: Kars
Operator: EBD Enerji Uretim ve Ticaret AS
Configuration: 4 X 7.2-MW
Operation: 2014
T/G supplier: Yunhe
EPC: Coyne ve Bellier Muhendislik Musavirlik

Photograph courtesy of Unal Grup
Posted 16 Jan 2017

Abbreviations

Data: industcards, Platts UDI World Electric Power Plants Data Base

Updated 16-Jan-2017