Belper
Location: Derbyshire, England
Operator: Belper Hydro
Configuration: 2 X 200 kW
Operation: 1990
T/G supplier: Gilkes
Photograph courtesy of Norweb
Posted 15 Jun 2003
|
Cwm Croesor Rebuild
Location: Gwynedd, Wales
Operator: RWE Innogy
Configuration: 1 X 500 kW Pelton
Operation: 1999
T/G supplier: Gilkes, Alconza
EPC: Dulas
Quick Facts: Cwm Croesor is in Snowdonia National Park in North Wales
and began operations about 100yrs ago to power local slate quarries. The
former exposed pipeline was replaced with an underground pipeline and
the existing dam and powerhouse were refurbished. The location required
particular care in the rebuilding effort with the use of stonewall
terracing and geotextiles. The plant is connected to the local
distribution grid with underground cables.
Photograph by Dan Crow (wikimedia)
Posted 20 Apr 2008 |
Maentwrog
Location: Gwynedd, Wales
Operator: British Nuclear Group
Configuration: 2 X 15 MW Francis
Operation: 1928
T/G supplier: Boving, EE
Quick Facts: The T/G sets have been rebuilt twice and the plant's
capacity doubled. Ownership by BNG is due to the
fact that Trawsfynydd nuclear power station uses the same lake for
cooling water.
Photograph courtesy of British Nuclear
Fuels Ltd
Posted 13 Jun 2004 |
|
|
Talybont
Location: Wales
Operator: Talybont-on-Usk Energy
Configuration: 1 X 34 kW crossflow
Operation: 2006
T/G supplier: Valley Hydro, Marelli
EPC: Dulas Ltd
Quick Facts: This is the first community-based energy plant in
Wales. ToUE was set-up in 2001 to restore hydropower generation at the
Dwr Cymru Talybont Reservoir. The group secured funding
for a detailed technical study and secured a grant for £90,000 for
equipment and installation in a structure formerly used to provide power
for the reservoir works. A 15yr lease was
negotiated for the new minihydro power station.
Photograph courtesy of Talybont-on-Usk Energy
Posted 7 Jun 2006 |
|