Hydroelectric Power Plants in Ukraine

Dniprodzerzhinska
Location: Dnipropetrovsk
Operator: Dniprogidroenergo
Configuration: 8 X 44 MW propeller
Operation: 1963-1964
T/G supplier: Kharkov, UETM
Quick facts: This is the fourth stage of the hydro cascade on the Dnieper River. Annual output is about 1.4 TWh.  Plant rehabilitation is underway with World Bank funding.

Photograph courtesy of Dniprogidroenergo
Posted 11 Jun 2005

Dniprovska I & II
Location: Zaporizhzhya
Operator: Dniprogidroenergo
Configuration: 9 X 72 MW Francis, 6 X 105 MW propeller
Operation: 1947-1950 (Plant I) 1974-1980 (Plant II)
T/G supplier: LMZ, GE, Kharkov
Quick facts: This is the fifth stage of the hydro cascade on the Dnieper River. Construction started in 1927 and ten 56-MW units were put online between  1932 and 1939.  During World War II, the plant was completely destroyed.  Reconstruction began in 1944 and the first rebuilt unit went online in in March 1947.  In April 1972, construction started on the second phase plant.

Photograph courtesy of Dniprogidroenergo
Posted 11 Jun 2005

Dnister
Location: Chernivtsy
Operator: Dnisterhydroenergo
Configuration: 6 X 117 MW Kaplan
Operation: 1981-1983
T/G supplier: Kharkov
EPC: Ukrhydroproject
Quick facts: The site is located in the middle reach of the Dnister river, upstream of Mogilev-Podolsk. It includes earth dams flanking the center spillway and powerhouse and a 330/110kV outdoor switchyard.

Photograph courtesy of Ukrhydroproject
Posted 8 Mar 2007

Dnister Buffer
Location: Chernivtsy
Operator: Dnisterhydroenergo
Configuration: 3 X 9 MW Bulb
Operation: 1998
T/G supplier: Kharkov
EPC: Ukrhydroproject
Quick facts: This dam forms a buffer reservoir below the main Dnister power station.

Photograph courtesy of Ukrhydroproject
Posted 8 Mar 2007

 

Kakhovka
Location: Kherson
Operator: Dniprogidroenergo
Configuration: 3 X 59 MW propeller
Operation: 1955-1956
T/G supplier: Kharkov
EPC: Ukrhydroproject
Quick facts: This is the lowest hydro project on the Dnieper. Average output is 1.4 TWh/yr. Alstom supplied a new control system for the plant in 1998.

Photograph courtesy of Ukrhydroproject
Posted 25 Mar 2007

Kaniv
Location: Cherkassy
Operator: Dniprogidroenergo
Configuration: 24 X 18.5 MW bulb
Operation: 1972-1975
T/G supplier: Kharkov

EPC: Ukrhydroproject

Quick facts: This is the second stage of the hydro cascade on the Dnieper River. Annual output is about 970 GWh.  Plant rehabilitation is underway with World Bank funding. Construction was started on a 3.6-GW pumped-storage plant nearby, but the project was halted in 1994 due to lack of funding.

Photograph courtesy of Dniprogidroenergo
Posted 11 Jun 2005

Kremenchuk
Location: Cherkassy
Operator: Dniprogidroenergo
Configuration: 12 X 57 MW propeller
Operation: 1959-1960
T/G supplier: Kharkov

EPC: Ukrhydroproject

Quick facts: This is the third stage of the hydro cascade on the Dnieper River and the Kremenchuk Reservoir is the largest on the river stretching for 185 km with a water surface of 2,250kmē. Annual output is about 1.5 TWh.

Photograph courtesy of Dniprogidroenergo
Posted 26 Jun 2005

Kyivska HPS
Location: Kyiv
Operator: Dniprogidroenergo
Configuration: 1 X 16 MW, 3 X 22 MW, 16 X 18.5 MW bulb
Operation: 1964-1968
T/G supplier: Kharkov
EPC: Ukrhydroproject
Quick facts: This plant has integrated abutments on both banks, a concrete dam with 20 spillways, navigation lock, earth-fill dams and embankments, and a 110kV outdoor switchyard.

Photograph courtesy of Ukrhydroproject
Posted 25 Mar 2007

Kyivska HPSS
Location: Kyiv
Operator: Dniprogidroenergo
Configuration: 3 X 33.3 MW conv, 3 X 45 MW pump
Operation: 1970-1972
T/G supplier: Kharkov
Quick facts: Kyivska HPSS is located on the right bank of Kyiv water storage 2.5km upstream from Kyivska HPS. The reservoir of Kyivska HPS acts as the lower water reservoir for the pumped-storage plant.

Photograph courtesy of Dniprogidroenergo
Posted 26 Jun 2005

 

Sabarovskaya
Location: Vinnytsya
Operator: Vinnitsaoblenergo OJSC
Configuration: 1.05 MW
Operation: ??
T/G supplier: ??
Quick facts: This plant is on a reservoir at Km 571 on the Southern Bug River, the largest river system entirely within Ukraine's borders.

Photograph courtesy of Vinnitsaoblenergo
Posted 24 Jul 2010

 

Tereblja-Rikskaya
Location: Zakarpatie
Operator: Zakarpattyaoblenergo
Configuration: 3 X 9 MW
Operation: 1955
T/G supplier: UETM
EPC: Ukrhydroproject
Quick facts: This plant  has  integrated abutments on both banks, a concrete spillway dam with 20 spillways, navigation lock, earth-fill dams and embankments, and a 110kV outdoor switchyard.

Photograph courtesy of Ukrhydroproject
Posted 25 Mar 2007 

Abbreviations

Data: industcards, Platts UDI World Electric Power Plants Data Base

Updated 07/26/10