Hydroelectric Plants in the USA - Arkansas & Missouri
Blakely Mountain Dam
Location: AR
Operator: U.S. Army Corps of Engineers
Configuration: 2 X 37.5 MW Francis
Operation: 1955
T/G supplier: SMS, WH
Quick facts: The Blakely Mountain Dam was authorized by the Flood Control Act of 1944. Construction began in 1948 and ended in 1953 when the gates where closed, thereby creating Lake Ouachita. The earth dam is 231ft high and 1100ft.

Photograph courtesy of U.S. Army Corps of Engineers
Posted 20 Mar 2005

Bull Shoals
Location: AR
Operator: U.S. Army Corps of Engineers
Configuration: 4 X 40 MW, 4 X 45 Francis
Operation: 1952-1963
T/G supplier: AC
Quick facts: This is one of four multiple-purpose projects constructed in the upper White River Basin for flood control and power generation. The dam was started in 1947 and completed in 1951. The Phase I powerhouse and switchyard were completed in 1952. With installation of the final two generating units in Dec 1963, construction was completed at a cost of about $86mn.

Photograph courtesy of U.S. Army Corps of Engineers
Posted 6 Nov 2005

Harry S Truman Dam
Location: MO
Operator: U.S. Army Corps of Engineers
Configuration: 6 X 26.667 MW Francis
Operation: 1979-1982
T/G supplier: AC, BLH
Quick facts: Truman Dam is a mile-long earth/rock embankment structure. Electricity is sold through the Southwest Power Administration.

Photograph courtesy of U.S. Army Corps of Engineers
Posted 10 Apr 2005

 
Ozark Beach Dam
Location: MO
Operator: Empire District Electric Co
Configuration: 4 X 4 MW Francis
Operation: 1931
T/G supplier: Leffel, AC
EPC: Ambursen Hydraulic Construction Co, White River Construction Co
Quick facts: In 1909, a groupd of St Louis businessmen formed Ozark Power and Water Co to build a HPP on the White River. The proect was approved in 1911 and work got underway. The Ozark Beach Dam, also know as the Powersite Dam, was designed in 1911 by Nils F Ambursen as the largest concrete buttress dam of its kind. The 1,300ft long structure is in Taney Co, and the reservoir it forms is Lake Taneycomo.

Photograph courtesy of Empire District Electric Co
Posted 9 Aug 2014

Stockton Dam
Location: MO
Operator: U.S. Army Corps of Engineers
Configuration: 1 X 45 MW propeller
Operation: 1972
T/G supplier: NN, GE
Quick facts: Construction on the Stockton Dam began in Oct 1963 and was completed in Dec 1969. Electricity from the project is sold through the Southwest Power Administration.

Photograph courtesy of U.S. Army Corps of Engineers
Posted 10 Apr 2005