Diesel and Gas-Engine Power Plants in Southern Africa
Luanda Emergency
Location: Angola
Operator: Empresa Nacional de Electricidade (ENE-EP)
Configuration: 24 X 1.7 MW 9H21/32 engines
Operation: 2013
Fuel: diesel oil
E/G supplier: Hyundai
EPC: Henan Electric Power Survey & Design Institute, Sinohydro No 4

Photograph courtesy of PowerChina
Posted 3 Jan 2015

Kuito Nova
Location: Angola
Operator: Empresa Nacional de Electricidade (ENE-EP)
Configuration: 4 X 2.5 MW
Operation: 2011
Fuel: diesel oil
E/G supplier: ??
EPC: TSE - Techniques Speciales a l'Export
Quick facts: In Mar 2008, ENE announced agreements for new DPP at Kuito (Bie province), Saurimo (Lunda Sul) and Luena (Moxico). The Kuito and Suarimo projects were awarded to TSE Angola. The Kuito budget was $19.7mn.

Photograph courtesy of TSE - Techniques Speciales a l'Export
Posted 5 Oct 2014

Kuvaninga Energia
Location: Mozambique
Operator: Kuvaninga Energia SA
Configuration: 10 X 4-MW J624 engines
Operation: 2017
Fuel: natural gas
T/G supplier: Jenbacher
EPC: Clarke Energy
Quick facts: This IPP in Chokwe, Gaza, was designed to use Mozambique royalty gas. ADC completed the due diligence and acted as owner's project manager for investor Enventure Partners. Financial close was in Jan 2016, construction began in Jun 2014, and the project was declared complete in Dec 2015. Unfortunely, gas supplies were not yet available.

Photograph courtesy of ADC Projects
Posted 26 Feb 2017

Mariannhill Landfill
Location: South Africa
Operator: Durban Solid Waste
Configuration: 1 X 1.06 MW JGC 320 GS-LL engine
Operation: 2007
Fuel: landfill gas
T/G supplier: Jenbacher
EPC: Envitech Solutions (Pty) Ltd
Quick facts: South Africa's first landfill gas power projects are at two sites near Durban. eThekwini Electricity purchases surplus electricity output.

Photograph courtesy of GE Energy
Posted 13 Jan 2007

Ndola Energy Phase 1
Location: Zambia
Operator: Ndola Energy Co (NEC)
Configuration: 6 X 8.3 MW 20V32 engines
Operation: 2013
Fuel: heavy oil
E/G supplier: Wartsila
Quick facts: In Jan 2011, ZESCO and Ndola Energy submitted a proposed PPA to ERB for this heavy fuel, DPP near the Indeni Refinery. NEC was then a subsidiary of Concordia Energy Group of Mauritius andis now owned by GL Africa Energy UK.

Photograph courtesy of GL Africa Energy UK
Posted 1 Feb 2017

Power Alt
Location: South Africa
Operator: ADC Projects
Configuration: 4 X 2.7-MW JGS620GS engines
Operation: 2012
Fuel: natural gas
T/G supplier: Jenbacher
EPC: Agaricus Trading (Pty) Ltd, Group 5
Quick facts: This IPP in Middelburg, Mpumalanga, was developed by ADC Projects starting in 2007. Construction began in 2008 and the project was completed in 11mos. This was one of the first gas-fired IPPs to sell power to Eskom. Thos Begbie Holdings (Pty) Ltd is the gas supplier.

Photograph courtesy of ADC Projects
Posted 26 Feb 2017

Saurimo
Location: Angola
Operator: Empresa Nacional de Electricidade (ENE-EP)
Configuration: 3 X 2.5 MW
Operation: 2012
Fuel: diesel oil
E/G supplier: ??
EPC: TSE - Techniques Speciales a l'Export
Quick facts: Ministro de Estado e da Coordenacao Econуmica, Manuel Vicente opened this DPP on 24 May 2012. It supplies electricity to ten districts around the city of Saurimo in Lunda-Sul. The Saurimo project budget was $15.9mn.

Photograph courtesy of TSE - Techniques Speciales a l'Export
Posted 5 Oct 2014

Ressano Garcia
Location: Mozambique
Operator: Central Termica de Ressano Garcia
Configuration: 18 X 9.78-MW V34SG engines
Operation: 2014
Fuel: natural gas
E/G supplier: Wartsila
EPC: Wartsila
Quick facts:This large gas-fired DPP is a JV of Electricidade de Moçambique and Sasol. The order for the $250 facility was placed on 12 Dec 2012 and it started operation in early Sep 2014.The site is near the Mozambique/RSA border. Fuel is from the Pande and Temane gas fields. 

Photograph courtesy of Sasol
Posted 10 Sep 2014

Sasol One
Location: South Africa
Operator: Sasol Ltd
Configuration: 18 X 7.8-MW 18V34SG engines
Operation: 2013
Fuel: natural gas
E/G supplier: Wartsila
EPC: Wartsila
Quick facts: This project was ordered on 4 Jul 2011 and inagurated on 10 Jul 2013 as the largest gas-engine power station in Africa. The complete turnkey project is at Sasol's main works at Sasolburg, south of Johannesburg. The plant is at 1,500m elevation and will be run by Wartsila under a 3yr O&M agreement.

Photograph courtesy of Wartsila
Posted 10 Jul 2013

Abbreviations

Data: industcards, Platts UDI World Electric Power Plants Data Base

Updated 26-Feb-2017