Kazincbarcika
Location: Borsod-Abauj-Zemplen
Operator: Sigma Kft
Configuration: 3 X 3.3 MW 18V220SG engines CHP
Operation: 2002
Fuel: natural gas
E/G supplier: Wartsila
EPC: Sigma
Quick facts: This CHP plant is owned by local heating company Kazincbarcika Önkormányzata Timpanon kft and is operated under a 20yr energy supply agreement by Sigma. The project also has three 16 MWt Alstom Megatherm hot water boilers.

Photograph courtesy of Sigma Kft
Posted 1 Feb 2015

Miskolc
Location: Borsod-Abauj-Zemplen
Operator: MIFU Kvt
Configuration: 5 X 3.9 MW TBG632V16F engines CHP
Operation: 2003
Fuel: natural gas
E/G supplier: Deutz
EPC: EGI
Quick facts: In late 2001, MVM won a tender to install three new CHP plans for the district heating system in Miskolc. MVM then signed a contract with EGI and Germany's Deutz for the delivery and installation of gas engines at three different installations.

Photograph courtesy of MVM Zrt
Posted 25 Mar 2007

Ozdi
Location: Borsod-Abauj-Zemplen
Operator: Ózdi Erőmű Kft
Configuration: 2 X 2.433 MW JMS616 engines CHP
Operation: 2005
Fuel: natural gas
E/G supplier: Jenbacher
EPC: Sigma
Quick facts: This CHP company was formed by Sinergy Kft plant and local heating company Ózd Város Önkormányzata. The new CHP plant was built in an extension to the existing bolier house and covers about 30% of the local heating load.

Photograph courtesy of Sigma Kft
Posted 1 Feb 2015

Szekesfehervar
Location: Fejer
Operator: Eromu Fejleszto Beruhazo Kft
Configuration: 8 X 3.05 MW JMS 620 GS-NLC engines CHP
Operation: 2006
Fuel: natural gas
E/G supplier: Jenbacher
EPC: Energott Kft
Quick facts: This two-site CHP supplies an industrial city about 65km southwest of Budapest.

Photograph courtesy of GE Energy
Posted 28 Jun 2006

Tatabanya
Location: Komárom-Esztergom
Operator: Vertesi Eromu Rt
Configuration: 3 X 6 MW CHP
Operation: 2005
Fuel: natural gas, oil
E/G supplier: Wartsila
EPC: EGI
Quick facts: In Jan 2005, MVM completed an Ft 6bn fuel conversion and plant extension project at Tatabanya. This involved converting two existing steam sets to gas firing and the addition of three new gas engines. The CHP plant will run mainly on natural gas supplied by a new 13km, high-pressure gas pipeline from MOL's gas substation at Szentgyorgypustza. Ganz Danubius was the main contractor on the existing sets. The plant was acquired by MVM in Sep 2004 for Ft 1,678mn.  It has a 20yr heating contract with the town and sells power to the grid.

Photograph courtesy of Tatabanya Eromu Kft
Posted 8 Mar 2007

Tiszaujvaros
Location: Borsod-Abauj-Zemplen
Operator: Sigma Kft
Configuration: 2 X 3.2 MW 18V220SG engines CHP
Operation: 2002
Fuel: natural gas
E/G supplier: Wartsila
EPC: Sigma
Quick facts: This CHP plant has a 20yr energy supply agreement with the local heating company. The project also has three 12 MWt Alstom Megatherm hot water boilers.

Photograph courtesy of Sigma Kft
Posted 1 Feb 2015