Diesel and Gas-Engine Plants in Mexico

Baja California Sur
Location: BCS
Operator: Comision Federal de Electricidade
Configuration: 1 X 37.5-MW 10K90MC-S engine, 2 X 42-MW 12K90MC-S engine
Fuel: heavy oil
Operation: 2005-2012
E/G supplier: MAN B&W, Manises, Hyundai, Alstom
EPC: Abengoa
Quick facts: The BCS power station is in San Francisco 14km from La Paz. A fourth MAN B&W engine was ordered in Mar 2012.

Photograph courtesy of MAN B&W Diesel
Posted 21 Mar 2012

Cozumel
Location: QROO
Operator: Energia y Agua Pura de Cozumel
Configuration: 4 X 6.2-MW 18V32LN engines
Fuel: heavy oil
Operation: 2001
E/G supplier: Wartsila
EPC: Wartsila, Kepler
Quick facts: This plant is to be re-located to Guyana.

Photograph courtesy of Wartsila Oy
Posted 3 Apr 2001

Olachea (San Carlos)
Location: BCS
Operator: Comision Federal de Electricidade
Configuration: 2 X 32-MW 12RTA76 engines, 1 X 42-MW 12K90MC-S engine
Fuel: heavy oil
Operation: 1991-2001
E/G supplier: MHI, Hyundai, MAN B&W, ABB
EPC: MHI, Hyundai, MAN B&W, ABB<

Photograph courtesy of MAN B&W Diesel
Posted 1 Apr  2003

Salinas Victoria Landfill
Location: NL
Operator: Sistemas de Energia Internacional SA de CV (Simeprodeso)
Configuration: 7 X 1.006-kW JGC 320 GS-LL engines
Operation: 2003
Fuel: landfill gas
E/G supplier: Jenbacher
Quick facts: In Sep 1999, Simeprodeso released a tender for development of a power plant at a landfill in Salinas Victoria, Nuevo Leon. In May 2003, the power plant went into operation, the first of its kind in the country.

Photograph courtesy of GE Jenbacher
Posted 6 Apr 2007

San Juan del Río
Location: QRO
Operator: Cartones Ponderosa SA de CV
Configuration: 3 X 6.5 MW 18V32 engines CHP
Fuel: heavy oil
Operation: 2005
E/G supplier: Wartsila
EPC: Wartsila
Quick facts: This power plant serves Mexico's largest cardboard recycling and corrugated fiber facility. Total production capacity is now 220,000 tpy.
The new CHP engines replaced three, 3-MW Kawasaki M1A-13A gas turbines installed in 1995.

Photograph courtesy of Wartsila Oy
Posted 21 Dec 2008

Toluca
Location: MEX
Operator: Nestle SA
Configuration: 1 X 2.4 MW 12V220SG engine CHP
Fuel: natural gas
Operation: 2001
E/G supplier: Wartsila
EPC: Wartsila
Quick facts: This power plant serves Mexico's largest cardboard recycling and corrugated fiber facility. total production capacity is now 220,000 tpy.

Photograph courtesy of Wartsila Oy
Posted 21 Dec 2008

   

 

Villa Reyes
Location: SLP
Operator: Productora Nacional de Papel SA de CV (Pronal)
Configuration: 2 X 6.5 MW 18V32 engines CHP
Fuel: heavy oil
Operation: 2005
E/G supplier: Wartsila
EPC: Wartsila, Constructora Kepler
Quick facts: This facility is at a newsprint mill and produces 6.6 tph of steam for the production line. The new engine plant replaced a 20yr old, 4-MW oil-fired steam turbine cogen plant.

Photograph courtesy of Wartsila Oy
Posted 21 Dec 2008

 

Abbreviations

Data: industcards, Platts UDI World Electric Power Plants Data Base

Updated 21-Mar-2012

Home